Found: 13
Select item for more details and to access through your institution.
Common inventory modeling assumptions that fall short: Arborescent networks, Poisson demand, and single-echelon approximations
- Published in:
- Journal of Operations Management, 2011, v. 29, n. 5, p. 488, doi. 10.1016/j.jom.2010.11.008
- By:
- Publication type:
- Article
Enterprise resource planning (ERP)—A brief history
- Published in:
- Journal of Operations Management, 2007, v. 25, n. 2, p. 357, doi. 10.1016/j.jom.2006.11.005
- By:
- Publication type:
- Article
PLAYING THE BEER DISTRIBUTION GAME OVER THE INTERNET.
- Published in:
- Production & Operations Management, 2000, v. 9, n. 1, p. 31, doi. 10.1111/j.1937-5956.2000.tb00321.x
- By:
- Publication type:
- Article
Replanning the Master Production Schedule for a Capacity-Constrained Job Shop.
- Published in:
- Decision Sciences, 1999, v. 30, n. 3, p. 719, doi. 10.1111/j.1540-5915.1999.tb00904.x
- By:
- Publication type:
- Article
Batch Construction Heuristics and Storage Assignment Strategies for Walk/Ride and Pick Systems.
- Published in:
- Management Science, 1999, v. 45, n. 4, p. 575, doi. 10.1287/mnsc.45.4.575
- By:
- Publication type:
- Article
A survey of group technology adoption in the American Midwest.
- Published in:
- Growth & Change, 1994, v. 25, n. 2, p. 183, doi. 10.1111/j.1468-2257.1994.tb00969.x
- By:
- Publication type:
- Article
SCHEDULING A FLEXIBLE MACHINING SYSTEM WITH DYNAMIC TOOL MOVEMENT.
- Published in:
- Production & Operations Management, 1993, v. 2, n. 1, p. 38
- By:
- Publication type:
- Article
A Comparison of Reorder Point and Material Requirements Planning Inventory Control Logic.
- Published in:
- Decision Sciences, 1992, v. 23, n. 2, p. 332, doi. 10.1111/j.1540-5915.1992.tb00392.x
- By:
- Publication type:
- Article
Tour Scheduling and Task Assignment of a Heterogenous Work Force: A Heuristic Approach.
- Published in:
- Decision Sciences, 1991, v. 22, n. 4, p. 719, doi. 10.1111/j.1540-5915.1991.tb00361.x
- By:
- Publication type:
- Article
REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING.
- Published in:
- Decision Sciences, 1988, v. 19, n. 2, p. 281, doi. 10.1111/j.1540-5915.1988.tb00267.x
- By:
- Publication type:
- Article
AN EXPERIMENTAL COMPARISON OF CELLULAR (GROUP TECHNOLOGY) LAYOUT WITH PROCESS LAYOUT.
- Published in:
- Decision Sciences, 1987, v. 18, n. 4, p. 562, doi. 10.1111/j.1540-5915.1987.tb01547.x
- By:
- Publication type:
- Article
A LAYOUT PLANNING SYSTEM WITH MULTIPLE CRITERIA AND A VARIABLE DOMAIN REPRESENTATION.
- Published in:
- Management Science, 1987, v. 33, n. 8, p. 1020, doi. 10.1287/mnsc.33.8.1020
- By:
- Publication type:
- Article
A NOTE ON SPACECRAFT FOR MULTI-FLOOR LAYOUT PLANNING.
- Published in:
- Management Science, 1984, v. 30, n. 5, p. 648, doi. 10.1287/mnsc.30.5.648
- By:
- Publication type:
- Article