Found: 5
Select item for more details and to access through your institution.
An Advanced Design of a Boring Bar for Grinding the Cylinder Plugs of the U8-6MA2 Drilling Pump.
- Published in:
- Chemical & Petroleum Engineering, 2018, v. 54, n. 7/8, p. 513, doi. 10.1007/s10556-018-0509-9
- By:
- Publication type:
- Article
Selection of Structural Dimensions of Twin Liners of a Mud Pump Cylinder and Calculation of Strength of Coupling with Assured Tightness.
- Published in:
- Chemical & Petroleum Engineering, 2017, v. 53, n. 7/8, p. 488, doi. 10.1007/s10556-017-0369-8
- By:
- Publication type:
- Article
Choice of Alternative Steel Grade for Manufacturing Bottom-Hole Pumping Rod Joint Couplings.
- Published in:
- Chemical & Petroleum Engineering, 2015, v. 51, n. 7/8, p. 536, doi. 10.1007/s10556-015-0082-4
- By:
- Publication type:
- Article
Phenomenon of Narrowing of Holes in Cylindrical Bushings of U8-6MA2 Mud Pump After High-Frequency Hardening.
- Published in:
- Chemical & Petroleum Engineering, 2014, v. 50, n. 3/4, p. 240, doi. 10.1007/s10556-014-9888-8
- By:
- Publication type:
- Article
Analysis of Efficiency of Methods for Improving Sucker-Rod Deep-Well Pump Plungers and Choice of an Alternative Method.
- Published in:
- Chemical & Petroleum Engineering, 2013, v. 49, n. 7/8, p. 536, doi. 10.1007/s10556-013-9788-3
- By:
- Publication type:
- Article