Found: 4
Select item for more details and to access through your institution.
GESTÃO DO CRONOGRAMA DE UMA EMPRESA FABRICANTE E INSTALADORA DE CHICOTES ELÉTRICOS DA CONSTRUÇÃO CIVIL.
- Published in:
- Brazilian Journal of Production Engineering / Revista Brasileira de Engenharia de Produção, 2023, v. 9, n. 4, p. 179, doi. 10.47456/bjpe.v9i4.42541
- By:
- Publication type:
- Article
MODELO CONCEITUAL DE BOAS PRÁTICAS DE PLANEJAMENTO DE MATERIAIS E MÃO DE OBRA ESPECÍFICO PARA O SETOR DA CONSTRUÇÃO CIVIL NA CIDADE DE CALI-COLÔMBIA.
- Published in:
- Revista Producao Online, 2023, v. 23, n. 1, p. 1, doi. 10.14488/1676-1901.v23i1.4936
- By:
- Publication type:
- Article
OS PRINCIPAIS PASSOS ADOTADOS NA APLICAÇÃO DE KAIZEN EM FABRICANTE DE COMPONENTES INDUSTRIAIS SERIADOS.
- Published in:
- Revista Producao Online, 2017, v. 17, n. 4, p. 1160, doi. 10.14488/1676-1901.v17i4.2512
- By:
- Publication type:
- Article
The methodology of machinery and equipment maintenance adopted by the textile industries located in the Zona da Mata Mineira.
- Published in:
- INGENIARE - Revista Chilena de Ingeniería, 2017, v. 25, n. 1, p. 134
- By:
- Publication type:
- Article