Found: 8
Select item for more details and to access through your institution.
Perfect periodic scheduling for three basic cycles.
- Published in:
- Journal of Scheduling, 2014, v. 17, n. 1, p. 47, doi. 10.1007/s10951-013-0331-3
- By:
- Publication type:
- Article
Bun splitting: a practical cutting stock problem.
- Published in:
- Annals of Operations Research, 2010, v. 179, n. 1, p. 15, doi. 10.1007/s10479-008-0458-3
- By:
- Publication type:
- Article
Parallel machine scheduling with job assignment restrictions.
- Published in:
- Naval Research Logistics, 2007, v. 54, n. 3, p. 250, doi. 10.1002/nav.20202
- By:
- Publication type:
- Article
Preface.
- Published in:
- Annals of Operations Research, 1999, v. 92, n. 1-4, p. 1
- By:
- Publication type:
- Article
Scheduling maintenance services to three machines.
- Published in:
- Annals of Operations Research, 1999, v. 86, n. 1-4, p. 375, doi. 10.1023/A:1018971222185
- By:
- Publication type:
- Article
A new heuristic for three-machine flow shop scheduling.
- Published in:
- Operations Research, 1996, v. 44, n. 6, p. 891, doi. 10.1287/opre.44.6.891
- By:
- Publication type:
- Article
A comparison of local search methods for flow shop scheduling.
- Published in:
- Annals of Operations Research, 1996, v. 63, n. 1-4, p. 489, doi. 10.1007/BF02156631
- By:
- Publication type:
- Article
FEASIBILITY OF SCHEDULING LOT SIZES OF THREE PRODUCTS ON ONE MACHINE.
- Published in:
- Management Science, 1992, v. 38, n. 10, p. 1482, doi. 10.1287/mnsc.38.10.1482
- By:
- Publication type:
- Article