Found: 3
Select item for more details and to access through your institution.
A Multistep Method for Automatic Determination and Optimization of Microseismic P-Phase Arrival Times in a Coal Mine.
- Published in:
- Advances in Civil Engineering, 2019, p. 1, doi. 10.1155/2019/3780875
- By:
- Publication type:
- Article
Mechanism of Coal Bump among Mine Group under the Control of Large Geological Body: A Case Study of Yima Mining Area, China.
- Published in:
- Advances in Civil Engineering, 2021, p. 1, doi. 10.1155/2021/8890651
- By:
- Publication type:
- Article
A marginalized two-part Beta regression model for microbiome compositional data.
- Published in:
- PLoS Computational Biology, 2018, v. 14, n. 7, p. 1, doi. 10.1371/journal.pcbi.1006329
- By:
- Publication type:
- Article