Found: 2
Select item for more details and to access through your institution.
Simulations to Verify Horizontal Flow Measurements from a Borehole Flowmeter.
- Published in:
- Ground Water, 2006, v. 44, n. 3, p. 394, doi. 10.1111/j.1745-6584.2005.00140.x
- By:
- Publication type:
- Article
Tracer tests in a fractured dolomite: 1. Experimental design and observed tracer recoveries.
- Published in:
- Water Resources Research, 2001, v. 37, n. 5, p. 1113, doi. 10.1029/2000WR900335
- By:
- Publication type:
- Article