Works matching IS 19985452 AND DT 2013
Results: 30
BOOK REVIEW.
- Published in:
- 2013
- By:
- Publication type:
- Book Review
Ethiopia grants WWDSE, ELC contract for 1060 MW hydro project.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 85
- Publication type:
- Article
Pakistan to receive $100m funds from Saudi for Neelam Jhelum hydro project.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 85
- Publication type:
- Article
Hydroelectric power bills now federal law.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 85
- Publication type:
- Article
Work on 40,000-MW Grand Inga to begin in October 2015, Congo says.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 85
- Publication type:
- Article
Chinese environmental ministry approves massive Shuangjiangkou hydropower project.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 85
- Publication type:
- Article
Regional cooperation key to sustaining eco-friendly development in the fragile Hindu Kush Himalayas.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 84
- Publication type:
- Article
ICIMOD has recently published a Report on 'Policy and Institutions in Adaptation to Climate Change: Case study on flood mitigation infrastructure in India and Nepal'.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 83
- Publication type:
- Article
30 foreign delegates to participate in hydropower meet.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 83
- Publication type:
- Article
Locals demand early construction of Upper Karnali.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 83
- Publication type:
- Article
SIKTA IRRIGATION PROJECT AT A GLANCE.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 82
- Publication type:
- Article
Electro-mechanical Contractor of Chameliya Threatens to Breach Contract.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 81
- Publication type:
- Article
Tunnel at Kulekhani project completed.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 81
- Publication type:
- Article
First Francis Turbine Made In Nepal.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 81
- Publication type:
- Article
Interview with Professor Dr. Govinda Raj Pokharel.
- Published in:
- 2013
- Publication type:
- Interview
GWP Nepal/JVS ACTIVITIES 2013.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 76
- Publication type:
- Article
Effect of Silt Size, Concentration on Erosion of Turgo Turbine Blades.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 72
- By:
- Publication type:
- Article
Preparing Nepal's Vision for 2050 in Water and Energy.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 70
- By:
- Publication type:
- Article
Water Quality Profile of Swan River Himachal Pradesh, India using GIS.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 64
- By:
- Publication type:
- Article
Overview of June 2013 Flood and Landslides with focus on Darchula Disaster.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 57
- By:
- Publication type:
- Article
Seminar: Mini-Hydro Development in Nepal: Status, Challenges and Prospects.
- Published in:
- 2013
- Publication type:
- Conference Paper/Materials
Water, Water Everywhere...but Will Everyone Have a Drink?
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 52
- By:
- Publication type:
- Article
Analysis of Squeezing Phenomenon in the Headrace Tunnel of Chameliya Project, Nepal.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 44
- By:
- Publication type:
- Article
Optimized Design of Francis Turbine Runner for Sand Laden Water.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 36
- By:
- Publication type:
- Article
Performance Evaluation of Pelton Turbine: A Review.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 28
- By:
- Publication type:
- Article
An Overview of Glaciers Distribution in the Nepal Himalaya.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 20
- By:
- Publication type:
- Article
The Necessity of/and Challenges to International Project Financing of Hydropower Projects in Nepal.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 16
- By:
- Publication type:
- Article
The 60 versus 90 MW Battle over Upper Trishuli-3A.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 8
- By:
- Publication type:
- Article
Harnessing Water Resources in Nepal: Flood Control to Hydropower Development.
- Published in:
- 2013
- By:
- Publication type:
- Editorial
Excellence Award.
- Published in:
- Hydro Nepal: Journal of Water, Energy & Environment, 2013, n. 13, p. 1
- Publication type:
- Article