Works matching IS 17532116 AND DT 2010 AND VI 9 AND IP 3
Results: 10
ILI performance management using advanced NDE systems.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 203
- By:
- Publication type:
- Article
The 2010 Chilean earthquake: gas distribution system resilience.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 197
- By:
- Publication type:
- Article
The lightning threat to pipelines and coatings.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 191
- By:
- Publication type:
- Article
HDD: a reliable way of pipeline crossing - some myths uncovered.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 179
- By:
- Publication type:
- Article
The role of FEM in the operation of pipelines in unstable soils.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 167
- By:
- Publication type:
- Article
Deep subsea oil and gas infrastructure development: some challenges and solutions.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 161
- By:
- Publication type:
- Article
Design of deepwater HP/HT pipe-in-pipe flowlines crossing mega-furrows in the Gulf of Mexico.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 153
- By:
- Publication type:
- Article
A comparison of the API 1104 Appendix A and BS 7910 procedures for the assessment of girth weld flaws.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 145
- By:
- Publication type:
- Article
Experience of flow assurance simulations.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 133
- By:
- Publication type:
- Article
The affect of various aspects of the environment on oil and gas pipelines.
- Published in:
- Journal of Pipeline Engineering, 2010, v. 9, n. 3, p. 131
- Publication type:
- Article