Works matching DE "CONSTRUCTION delays"
Results: 259
Identifying and assessing the impact of 4M1E factors on construction project delays in Afghanistan using structural equation modeling.
- Published in:
- Umm Al-Qura University Journal of Engineering & Architecture (Springer Nature), 2025, v. 16, n. 1, p. 30, doi. 10.1007/s43995-024-00086-w
- By:
- Publication type:
- Article
Procore's Design Coordination: A digital solution for resolving coordination issues.
- Published in:
- Concrete International, 2020, v. 42, n. 9, p. 47
- Publication type:
- Article
Prediction of an early failure point using infrared radiation characteristics and energy evolution for sandstone with different water contents.
- Published in:
- Bulletin of Engineering Geology & the Environment, 2021, v. 80, n. 9, p. 6913, doi. 10.1007/s10064-021-02345-9
- By:
- Publication type:
- Article
The Role of Artificial Intelligence Techniques in Enhancing Project Completion Speed: A Study on Using LSTM Networks for Predicting Delay Times.
- Published in:
- Journal of Economics & Administrative Sciences, 2024, v. 30, n. 142, p. 197, doi. 10.33095/n7rfbg91
- By:
- Publication type:
- Article
FACTORS AFFECTING TIME AND COST OVERRUNS IN THE CONSTRUCTION PROJECTS AND ITS CONTROL TECHNIQUES.
- Published in:
- Journal of the Balkan Tribological Association, 2022, v. 28, n. 1, p. 26
- By:
- Publication type:
- Article
CONSTRUCTION PROJECT DELAY DUE TO THE COVID-19 PANDEMIC.
- Published in:
- Journal of Surveying, Construction & Property, 2022, v. 13, p. 1, doi. 10.22452/jscp.sp2022no1.1
- By:
- Publication type:
- Article
Fuzzy Optimization Model for Decision-Making in Single Machine Construction Project Planning.
- Published in:
- Mathematics (2227-7390), 2024, v. 12, n. 7, p. 1088, doi. 10.3390/math12071088
- By:
- Publication type:
- Article
EVIDENCE OF EXISTENCE WINNER'S CURSE BETWEEN ENTERPRISES WIND AND PHOTOVOLTAIC POWER GENERATORS WINNERS OF THE 8TH RESERVE ENERGY AUCTION.
- Published in:
- Brazilian Journal of Management / Revista de Administração da UFSM, 2020, v. 13, p. 1459, doi. 10.5902/1983465932720
- By:
- Publication type:
- Article
A study of the Causes of Schedule overrun in Indian High-rise construction using Relative Importance Index.
- Published in:
- GSTF Journal of Engineering Technology, 2018, v. 5, n. 1, p. 1, doi. 10.5176/2251-3701_5.1.101
- By:
- Publication type:
- Article
Effect of Construction Delays and the Preventive Role of Concrete Works Optimization: Systematic Literature Review.
- Published in:
- TEM Journal, 2024, v. 13, n. 2, p. 1203, doi. 10.18421/TEM132-34
- By:
- Publication type:
- Article
Pipeline Projects: Matters Arising in the New Zealand Construction Industry.
- Published in:
- Journal of Engineering, Project & Production Management, 2024, v. 14, n. 3, p. 1, doi. 10.32738/JEPPM-2024-0023
- By:
- Publication type:
- Article
Exploring Causes of Delays in National Road and Highway Projects in Developing Construction Economy.
- Published in:
- Journal of Engineering, Project & Production Management, 2022, v. 12, n. 2, p. 137, doi. 10.32738/JEPPM-2022-0013
- By:
- Publication type:
- Article
Major Causes Assessment of Construction Delays.
- Published in:
- Journal of Engineering, Project & Production Management, 2020, v. 10, n. 3, p. 179, doi. 10.2478/jeppm-2020-0020
- By:
- Publication type:
- Article
Challenges in developing the Ethiopian construction industry.
- Published in:
- African Journal of Science, Technology, Innovation & Development, 2020, v. 12, n. 4, p. 373, doi. 10.1080/20421338.2019.1654252
- By:
- Publication type:
- Article
The association between caesarean section and cognitive ability in childhood.
- Published in:
- 2020
- By:
- Publication type:
- journal article
Disparities of Factors Affecting the Duration of Construction Projects Among Countries.
- Published in:
- International Review of Civil Engineering, 2021, v. 12, n. 1, p. 49, doi. 10.15866/irece.v12i1.19284
- By:
- Publication type:
- Article
Survey on the Most Significant Factors Affecting the Delivery Process of Construction Activities During Execution Phase in Iraq.
- Published in:
- International Review of Civil Engineering, 2020, v. 11, n. 3, p. 114, doi. 10.15866/irece.v11i3.17700
- By:
- Publication type:
- Article
Development of Delay Claim with a Traffic Volume Approach of the Road National Improvement Project.
- Published in:
- International Review of Civil Engineering, 2019, v. 10, n. 3, p. 142, doi. 10.15866/irece.v10i3.16221
- By:
- Publication type:
- Article
Effect of Synthesized Calcium Carbonate Nanoparticles on Fresh and Mechanical Properties of High Volume Natural Pozzolan Mortars.
- Published in:
- International Review of Civil Engineering, 2019, v. 10, n. 2, p. 85, doi. 10.15866/irece.v10i2.15620
- By:
- Publication type:
- Article
Prefabrication of substructures for single-detached dwellings on reactive soils: a review of existing systems and design challenges.
- Published in:
- Australian Journal of Civil Engineering, 2019, v. 17, n. 2, p. 120, doi. 10.1080/14488353.2019.1657056
- By:
- Publication type:
- Article
Research on vibration effect of tunnel blasting based on an improved Hilbert–Huang transform.
- Published in:
- Environmental Earth Sciences, 2021, v. 80, n. 5, p. 1, doi. 10.1007/s12665-021-09506-9
- By:
- Publication type:
- Article
Two Methods for Linearity Improvement in Digitally Controlled Delay Elements: Current Starved Type.
- Published in:
- Majlesi Journal of Electrical Engineering, 2017, v. 11, n. 1, p. 61
- By:
- Publication type:
- Article
3-D Tunnel Seismic Advance Prediction Method with Wide Illumination and High-Precision.
- Published in:
- Journal of Earth Science, 2024, v. 35, n. 3, p. 970, doi. 10.1007/s12583-021-1503-2
- By:
- Publication type:
- Article
Time-Varying Mechanical Analysis of Long-Span Spatial Steel Structures Integral Lifting in Construction Basing Building Information Model.
- Published in:
- Sustainability (2071-1050), 2023, v. 15, n. 14, p. 11256, doi. 10.3390/su151411256
- By:
- Publication type:
- Article
Expert Opinion on the Key Influencing Factors of Cost Control for Water Engineering Contractors.
- Published in:
- Sustainability (2071-1050), 2023, v. 15, n. 8, p. 6963, doi. 10.3390/su15086963
- By:
- Publication type:
- Article
Detection and In-Depth Analysis of Causes of Delay in Construction Projects: Synergy between Machine Learning and Expert Knowledge.
- Published in:
- Sustainability (2071-1050), 2022, v. 14, n. 22, p. 14927, doi. 10.3390/su142214927
- By:
- Publication type:
- Article
Design and Practice of Deep Foundation Pits for Large Storage Ponds in Complex Environments.
- Published in:
- Sustainability (2071-1050), 2022, v. 14, n. 21, p. 14046, doi. 10.3390/su142114046
- By:
- Publication type:
- Article
Prediction Liquidated Damages via Ensemble Machine Learning Model: Towards Sustainable Highway Construction Projects.
- Published in:
- Sustainability (2071-1050), 2022, v. 14, n. 15, p. 9303, doi. 10.3390/su14159303
- By:
- Publication type:
- Article
Significant Factors Causing Delay in the Cambodian Construction Industry.
- Published in:
- Sustainability (2071-1050), 2022, v. 14, n. 6, p. 3521, doi. 10.3390/su14063521
- By:
- Publication type:
- Article
Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects.
- Published in:
- Sustainability (2071-1050), 2021, v. 13, n. 17, p. 9503, doi. 10.3390/su13179503
- By:
- Publication type:
- Article
Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry.
- Published in:
- Sustainability (2071-1050), 2021, v. 13, n. 14, p. 7830, doi. 10.3390/su13147830
- By:
- Publication type:
- Article
An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing.
- Published in:
- Sustainability (2071-1050), 2021, v. 13, n. 7, p. 3975, doi. 10.3390/su13073975
- By:
- Publication type:
- Article
Weather-Related Construction Delays in a Changing Climate: A Systematic State-of-the-Art Review.
- Published in:
- Sustainability (2071-1050), 2021, v. 13, n. 5, p. 2861, doi. 10.3390/su13052861
- By:
- Publication type:
- Article
Optimization of Prefabricated Components in Housing Modular Construction.
- Published in:
- Sustainability (2071-1050), 2020, v. 12, n. 24, p. 10269, doi. 10.3390/su122410269
- By:
- Publication type:
- Article
Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling.
- Published in:
- Sustainability (2071-1050), 2020, v. 12, n. 21, p. 8918, doi. 10.3390/su12218918
- By:
- Publication type:
- Article
Development and Application of Precast Concrete Double Wall System to Improve Productivity of Retaining Wall Construction.
- Published in:
- Sustainability (2071-1050), 2020, v. 12, n. 8, p. 3454, doi. 10.3390/su12083454
- By:
- Publication type:
- Article
Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model.
- Published in:
- Sustainability (2071-1050), 2020, v. 12, n. 4, p. 1514, doi. 10.3390/su12041514
- By:
- Publication type:
- Article
Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects.
- Published in:
- Sustainability (2071-1050), 2019, v. 11, n. 21, p. 5973, doi. 10.3390/su11215973
- By:
- Publication type:
- Article
Improving Construction Productivity by Integrating the Lean Concept and the Clancey Heuristic Model.
- Published in:
- Sustainability (2071-1050), 2019, v. 11, n. 17, p. 4535, doi. 10.3390/su11174535
- By:
- Publication type:
- Article
Effects of Payment Delays at Two Links in Payment Chains on the Progress of Construction Projects: System Dynamic Modeling and Simulation.
- Published in:
- Sustainability (2071-1050), 2019, v. 11, n. 15, p. 4115, doi. 10.3390/su11154115
- By:
- Publication type:
- Article
Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project.
- Published in:
- Sustainability (2071-1050), 2018, v. 10, n. 12, p. 4772, doi. 10.3390/su10124772
- By:
- Publication type:
- Article
Rio de Janeiro residents' perceptions of the 2016 Olympics in the pre-Games period.
- Published in:
- Tourism & Management Studies, 2019, v. 15, n. 1, p. 55, doi. 10.18089/tms.2019.150105
- By:
- Publication type:
- Article
Causes of Delay in the Construction Projects of Subway Tunnel.
- Published in:
- Advances in Civil Engineering, 2020, p. 1, doi. 10.1155/2020/8883683
- By:
- Publication type:
- Article
Adaptability of the Cutter-Head of the Earth Pressure Balance (EPB) Shield Machine in Water-Rich Sandy and Cobble Strata: A Case Study.
- Published in:
- Advances in Civil Engineering, 2020, p. 1, doi. 10.1155/2020/8847982
- By:
- Publication type:
- Article
Quantitative Definition of Seismic Performance Levels for Precast Bridge Piers with Continuous Reinforcement.
- Published in:
- Advances in Civil Engineering, 2020, p. 1, doi. 10.1155/2020/4087532
- By:
- Publication type:
- Article
The Continental.
- Published in:
- Builder: The Magazine of the National Association of Home Builders, 2020, v. 43, n. 9, p. 30
- By:
- Publication type:
- Article
Untitled.
- Published in:
- Builder: The Magazine of the National Association of Home Builders, 2020, v. 43, n. 6, p. 31
- By:
- Publication type:
- Article
Delivering human-centred housing: understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England.
- Published in:
- Construction Management & Economics, 2023, v. 41, n. 4, p. 277, doi. 10.1080/01446193.2022.2111694
- By:
- Publication type:
- Article
Quantifying the interruption impact of activity delays in non-serial repetitive construction projects.
- Published in:
- Construction Management & Economics, 2020, v. 38, n. 6, p. 515, doi. 10.1080/01446193.2019.1657922
- By:
- Publication type:
- Article
Structural equation model for investigating factors affecting delay in Indian construction projects.
- Published in:
- Construction Management & Economics, 2012, v. 30, n. 10, p. 869, doi. 10.1080/01446193.2012.717705
- By:
- Publication type:
- Article