Works matching IS 20957874 AND DT 2021 AND VI 41 AND IP 2


Results: 16
    1
    2

    沉管隧道整体管节工厂预制方法.

    Published in:
    China Harbour Engineering, 2021, v. 41, n. 2, p. 55, doi. 10.7640/zggwjs202102012
    By:
    • 林巍;
    • 林鸣;
    • 梁杰忠;
    • 田英辉;
    • 陈伟彬;
    • 刘凌锋;
    • 邹威
    Publication type:
    Article
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16