Works matching IS 20964498 AND DT 2022 AND VI 42 AND IP 10


Results: 18
    1
    2
    3
    4
    5
    6
    7

    不同锚具锚固效果及最佳限位距离研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2022, v. 42, n. 10, p. 1772, doi. 10.3973/j.issn.2096-4498.2022.10.012
    By:
    • 彭传阳;
    • 陈 强;
    • 方宗平;
    • 汪 波;
    • 陈 粟
    Publication type:
    Article
    8
    9
    10
    11
    12
    13
    14

    巨跨扁平洞室施工期拱部沉降分析.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2022, v. 42, n. 10, p. 1712, doi. 10.3973/j.issn.2096-4498.2022.10.005
    By:
    • 宋超业;
    • 吕书清;
    • 贺维国;
    • 洪开荣;
    • 刘永胜;
    • 王 星
    Publication type:
    Article
    15
    16
    17
    18