Works matching IS 20964498 AND DT 2022 AND VI 42 AND IP 7


Results: 20
    1
    2
    3
    4
    5
    6

    盾构隧道管片接头缩尺试验模拟方法.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2022, v. 42, n. 7, p. 1187, doi. 10.3973/j.issn.2096-4498.2022.07.007
    By:
    • 唐检军;
    • 周宇航;
    • 石钰锋;
    • 袁 月
    Publication type:
    Article
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20