Works matching IS 20964498 AND DT 2020 AND VI 40 AND IP 11
Results: 16
马蹄形盾构的工程应用解析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1664, doi. 10.3973/j.issn.2096-4498.2020.11.016
- By:
- Publication type:
- Article
连拱隧道衬砌厚度不足对结构安全性的影响研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1586, doi. 10.3973/j.issn.2096-4498.2020.11.006
- By:
- Publication type:
- Article
赣深高铁龙南隧道大型富水断层破碎带施工技术.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1634, doi. 10.3973/j.issn.2096-4498.2020.11.012
- By:
- Publication type:
- Article
考虑水压作用过程的盾构隧道接缝防水机制研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1594, doi. 10.3973/j.issn.2096-4498.2020.11.007
- By:
- Publication type:
- Article
盾构隧道始发与到达段环间纵向压力空间分布规律研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1552, doi. 10.3973/j.issn.2096-4498.2020.11.002
- By:
- Publication type:
- Article
敞开式顶管机改造及洞内组装升级泥水平衡顶管机施工技术 ———以深圳电网北环 110 kV 架空线改造入地电缆隧道工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1649, doi. 10.3973/j.issn.2096-4498.2020.11.014
- By:
- Publication type:
- Article
循环荷载下微波照射玄武岩的损伤变形与能量特征.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1578, doi. 10.3973/j.issn.2096-4498.2020.11.005
- By:
- Publication type:
- Article
市政排水隧道管片环宽、分块形式及螺栓数设计研究 ———以天津市政排水盾构隧道工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1625, doi. 10.3973/j.issn.2096-4498.2020.11.011
- By:
- Publication type:
- Article
复合式衬砌隧道防排水设计几个问题探讨.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1615, doi. 10.3973/j.issn.2096-4498.2020.11.010
- By:
- Publication type:
- Article
基于 MicroStation 的隧道帽檐斜切式洞门参数化建模研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1602, doi. 10.3973/j.issn.2096-4498.2020.11.008
- By:
- Publication type:
- Article
基于 BIM-GIS 技术的城市轨道交通附属一体化工程应用研究 ———以北京地铁 19 号线一期工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1541, doi. 10.3973/j.issn.2096-4498.2020.11.001
- By:
- Publication type:
- Article
城市水下道路隧道驾驶安全影响因素分析和改善思路.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1558, doi. 10.3973/j.issn.2096-4498.2020.11.003
- By:
- Publication type:
- Article
凿岩台车采用长短眼配套控制隧道超挖技术.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1642, doi. 10.3973/j.issn.2096-4498.2020.11.013
- By:
- Publication type:
- Article
全断面竖井掘进机上排渣关键技术研究与试验.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1657, doi. 10.3973/j.issn.2096-4498.2020.11.015
- By:
- Publication type:
- Article
TBM 掘进模态综合实验平台升级改造研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1570, doi. 10.3973/j.issn.2096-4498.2020.11.004
- By:
- Publication type:
- Article
TBM 关键参数智能掘进系统的设计与实践.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 11, p. 1673, doi. 10.3973/j.issn.2096-4498.2020.11.017
- By:
- Publication type:
- Article