Works matching IS 20964498 AND DT 2020 AND VI 40 AND IP 9


Results: 18
    1
    2

    隧道内衬钢管运调一体机的优化设计.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 9, p. 1368, doi. 10.3973/j.issn.2096-4498.2020.09.016
    By:
    • 孔德顺;
    • 赵 常;
    • 李 泉;
    • 高相胜
    Publication type:
    Article
    3
    4
    5
    6
    7
    8

    新型水封爆破除尘技术试验研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 9, p. 1360, doi. 10.3973/j.issn.2096-4498.2020.09.015
    By:
    • 王轶君;
    • 潘卫华;
    • 姚文辉;
    • 张永明;
    • 贾悦迪
    Publication type:
    Article
    9
    10
    11
    12
    13

    公路隧道光环境信息感知及试验研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 9, p. 1251, doi. 10.3973/j.issn.2096-4498.2020.09.002
    By:
    • 梁 波;
    • 梁加林;
    • 何世永;
    • 崔璐璐
    Publication type:
    Article
    14
    15
    16
    17
    18