Works matching IS 20964498 AND DT 2020 AND VI 40 AND IP 8


Results: 20
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12

    深中通道海底隧道排烟系统总体方案.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 8, p. 1176, doi. 10.3973/j.issn.2096-4498.2020.08.010
    By:
    • 邓小华;
    • 宋神友;
    • 曹正卯;
    • 张 琦
    Publication type:
    Article
    13
    14
    15

    盾构舱内空气损失计算及影响因素分析.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 8, p. 1147, doi. 10.3973/j.issn.2096-4498.2020.08.006
    By:
    • 杨志勇;
    • 杨 星;
    • 漆伟强;
    • 江玉生;
    • 安宏斌
    Publication type:
    Article
    16
    17
    18
    19
    20