Works matching IS 20964498 AND DT 2020 AND VI 40 AND IP 4


Results: 24
    1
    2
    3
    4
    5

    敞口式矩形顶管机设计与研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 4, p. 591, doi. 10.3973/j.issn.2096-4498.2020.04.017
    By:
    • 吴彦星;
    • 肖 威;
    • 周 倩;
    • 孙 磊;
    • 徐光亿
    Publication type:
    Article
    6
    7

    隧道运营期内部空气温度的预测分析.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 4, p. 597, doi. 10.3973/j.issn.2096-4498.2020.04.018
    By:
    • 鲁 斌;
    • 蒋 涛;
    • 王树刚;
    • 刘石磊;
    • 尹 龙;
    • 翟康博
    Publication type:
    Article
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19

    深中通道沉管隧道主要建造技术.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 4, p. 603, doi. 10.3973/j.issn.2096-4498.2020.04.019
    By:
    • 陈 越;
    • 陈伟乐;
    • 宋神友;
    • 刘 健;
    • 金文良
    Publication type:
    Article
    20
    21
    22
    23
    24