Works matching IS 20964498 AND DT 2020 AND VI 40 AND IP 1


Results: 22
    1
    2
    3
    4
    5
    6
    7

    Key Technologies and Challenges of Shenzhong Link.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 1, p. 143, doi. 10.3973/j.issn.2096-4498.2020.01.019
    By:
    • SONG Shenyou;
    • CHEN Weile;
    • JIN Wenliang;
    • XIA Fengyong;
    • FU Baiyong
    Publication type:
    Article
    8

    深中通道工程关键技术及挑战.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 1, p. 143, doi. 10.3973/j.issn.2096-4498.2020.01.019
    By:
    • 宋神友;
    • 陈伟乐;
    • 金文良;
    • 夏丰勇;
    • 付佰勇
    Publication type:
    Article
    9
    10
    11
    12

    顶管法T 接隧道现场试验研究分析.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2020, v. 40, n. 1, p. 28, doi. 10.3973/j.issn.2096-4498.2020.01.004
    By:
    • 丁剑敏;
    • 董子博;
    • 莫振泽;
    • 靳永福;
    • 丁 謇;
    • 王乃龙
    Publication type:
    Article
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22