Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 8


Results: 29
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22

    地下工程平衡稳定理论再研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 8, p. 1221, doi. 10.3973/j.issn.2096-4498.2019.08.001
    By:
    • 朱汉华;
    • 吴志军;
    • 王迎超;
    • 丁 智
    Publication type:
    Article
    23
    24
    25
    26
    27
    28
    29