Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 6


Results: 27
    1
    2

    土压平衡箱涵掘进机的设计研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 6, p. 1045, doi. 10.3973/j.issn.2096-4498.2019.06.019
    By:
    • 蒋晓天
    Publication type:
    Article
    3

    盾构推进姿态控制策略研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 6, p. 1038, doi. 10.3973/j.issn.2096-4498.2019.06.018
    By:
    • 任颖莹;
    • 孙振川;
    • 褚长海
    Publication type:
    Article
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27