Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 3


Results: 28
    1
    2
    3
    4
    5
    6
    7

    大型地下空间的结构分割转换工法研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 3, p. 480, doi. 10.3973/j.issn.2096-4498.2019.03.020
    By:
    • 高毅;
    • 于少辉;
    • 李洋;
    • 程鹏;
    • 罗雨田;
    • 冯超元
    Publication type:
    Article
    8
    9
    10
    11
    12
    13
    14
    15
    16

    严寒地区隧道洞口渗井排水技术探讨.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 3, p. 430, doi. 10.3973/j.issn.2096-4498.2019.03.013
    By:
    • 刘学霸;
    • 杨春勃;
    • 梁文雨;
    • 王超朋
    Publication type:
    Article
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28