Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 2


Results: 31
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13

    TBM 掘进中滚刀受力实时监测方法研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 309, doi. 10.3973/j.issn.2096-4498.2019.02.018
    By:
    • 王少华;
    • 刘泉声;
    • 黄 兴;
    • 张晓波
    Publication type:
    Article
    14

    基于PSO 算法的反力架设计与优化.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 302, doi. 10.3973/j.issn.2096-4498.2019.02.017
    By:
    • 王 凯;
    • 张良辉;
    • 孙振川;
    • 李凤远;
    • 张 兵;
    • 王超峰
    Publication type:
    Article
    15
    16
    17
    18

    地下叠合墙接触面形式的设计研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 254, doi. 10.3973/j.issn.2096-4498.2019.02.010
    By:
    • 于 勇;
    • 李腾飞;
    • 马军秋;
    • 于艺林;
    • 田 辉
    Publication type:
    Article
    19
    20

    米仓山隧道深大竖井建井新法.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 268, doi. 10.3973/j.issn.2096-4498.2019.02.012
    By:
    • 唐 协;
    • 林国进;
    • 何 佳;
    • 安俊吉;
    • 周雄华;
    • 张 睿
    Publication type:
    Article
    21
    22

    地下车库联络道出入口设计研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 261, doi. 10.3973/j.issn.2096-4498.2019.02.011
    By:
    • 李 尚
    Publication type:
    Article
    23
    24

    海水环境下盾构泥浆性能试验研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 211, doi. 10.3973/j.issn.2096-4498.2019.02.005
    By:
    • 吕乾乾;
    • 孙振川;
    • 杨振兴;
    • 陈瑞祥;
    • 张 兵
    Publication type:
    Article
    25
    26
    27
    28
    29
    30
    31