Works matching IS 20964498 AND DT 2018 AND VI 38 AND IP 6


Results: 35
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15

    刮刀及撕裂刀磨损实时监测系统.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 6, p. 1060, doi. 10.3973/j.issn.2096-4498.2018.06.024
    By:
    • 卓兴建;
    • 路亚缇
    Publication type:
    Article
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30
    31

    城市地铁双护盾TBM设计及应用.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 6, p. 1052, doi. 10.3973/j.issn.2096-4498.2018.06.023
    By:
    • 王杜娟;
    • 宁向可
    Publication type:
    Article
    32
    33
    34
    35

    云桂线富宁隧道围岩分级变更分析.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 6, p. 895, doi. 10.3973/j.issn.2096-4498.2018.06.002
    By:
    • 刘伟;
    • 吴朝钢;
    • 周飞棚;
    • 张瑞
    Publication type:
    Article