Works matching IS 20964498 AND DT 2018 AND VI 38 AND IP 4


Results: 34
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17

    我国硬岩掘进机的创新与实践.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 4, p. 519, doi. 10.3973/j.issn.2096-4498.2018.04.001
    By:
    • 洪开荣;
    • 王杜鹃;
    • 郭如军
    Publication type:
    Article
    18
    19
    20
    21
    22
    23
    24

    国内盾构开舱技术现状与风险管控.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 4, p. 683, doi. 10.3973/j.issn.2096-4498.2018.04.020
    By:
    • 于宝敏;
    • 季玉国
    Publication type:
    Article
    25

    运行中市政管廊隧道的维修加固.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 4, p. 667, doi. 10.3973/j.issn.2096-4498.2018.04.018
    By:
    • 宋超业;
    • 金若翃;
    • 王蓉蓉
    Publication type:
    Article
    26
    27
    28
    29

    深圳至中山跨江通道工程总体设计.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 4, p. 627, doi. 10.3973/j.issn.2096-4498.2018.04.014
    By:
    • 徐国平;
    • 黄清飞
    Publication type:
    Article
    30

    沉管隧道横向地基刚度分布模式初探.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 4, p. 611, doi. 10.3973/j.issn.2096-4498.2018.04.012
    By:
    • 甘鹏山;
    • 赵国虎;
    • 袁勇;
    • 付佰勇
    Publication type:
    Article
    31
    32
    33

    妈湾跨海盾构隧道人员疏散模式研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 4, p. 551, doi. 10.3973/j.issn.2096-4498.2018.04.004
    By:
    • 曾艳华;
    • 李杰;
    • 彭康夫;
    • 韩通;
    • 张先富
    Publication type:
    Article
    34