Works matching IS 20964498 AND DT 2018 AND VI 38 AND IP 3


Results: 19
    1
    2

    TBM滚刀布置方案对比分析与评价.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 3, p. 474, doi. 10.3973/j.issn.2096-4498.2018.03.016
    By:
    • 崔 JL;
    • 贺飞;
    • 齐志冲;
    • 贺开伟
    Publication type:
    Article
    3
    4
    5
    6
    7
    8
    9

    高速铁路隧道支护参数的计算硏究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 3, p. 406, doi. 10.3973/j.issn.2096-4498.2018.03.008
    By:
    • 肖明清;
    • 陈立保;
    • 徐晨;
    • 王少峰;
    • 王克金
    Publication type:
    Article
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19