Works matching IS 20294913 AND DT 2005 AND VI 11 AND IP 4


Results: 11
    1
    2
    3
    4

    UPON SCHEDULING PROJECTS IN A DESIGN OFFICE.

    Published in:
    Technological & Economic Development of Economy, 2005, v. 11, n. 4, p. 278, doi. 10.3846/13928619.2005.9637708
    By:
    • Golenko-Ginzburg, Dimitri;
    • Baron, Anna;
    • Ben-Yair, Avner;
    • Greenberg, Doron
    Publication type:
    Article
    5
    6
    7
    8
    9
    10
    11