Works matching IS 21522812 AND DT 2012 AND VI 3 AND IP 3
Results: 6
Benefit-Cost Analysis of Environmental Projects: A Plethora of Biases Understating Net Benefits.
- Published in:
- Journal of Benefit-Cost Analysis, 2012, v. 3, n. 3, p. -1, doi. 10.1515/2152-2812.1041
- By:
- Publication type:
- Article
Cost Benefit Analysis of Centralized Wastewater Reuse Systems.
- Published in:
- Journal of Benefit-Cost Analysis, 2012, v. 3, n. 3, p. -1, doi. 10.1515/2152-2812.1060
- By:
- Publication type:
- Article
External Benefits of Brownfield Redevelopment: An Applied Urban General Equilibrium Analysis.
- Published in:
- Journal of Benefit-Cost Analysis, 2012, v. 3, n. 3, p. -1, doi. 10.1515/2152-2812.1092
- By:
- Publication type:
- Article
Taking "All Men Are Created Equal" Seriously: Toward a Metric for the Intergroup Comparison of Utility Functions Through Life Values.
- Published in:
- Journal of Benefit-Cost Analysis, 2012, v. 3, n. 3, p. -1, doi. 10.1515/2152-2812.1099
- By:
- Publication type:
- Article
The Economic Cost of Conscription and an Upper Bound on the Value of a Statistical Life: Hedonic Estimates from Two Margins of Response to the Vietnam Draft.
- Published in:
- Journal of Benefit-Cost Analysis, 2012, v. 3, n. 3, p. -1, doi. 10.1515/2152-2812.1107
- By:
- Publication type:
- Article
An Empirical Estimate of the Labor Response Function for Benefit-Cost Analysis.
- Published in:
- Journal of Benefit-Cost Analysis, 2012, v. 3, n. 3, p. -1, doi. 10.1515/2152-2812.1119
- By:
- Publication type:
- Article