Works matching DE "CONSTRUCTION project management"
Results: 1387
A cost estimation recommendation system for improved contingency management in construction projects.
- Published in:
- Neural Computing & Applications, 2025, v. 37, n. 5, p. 3521, doi. 10.1007/s00521-024-10740-y
- By:
- Publication type:
- Article
INTEGRATING BUILDING INFORMATION MODELLING (BIM) INTO CONSTRUCTION: INNOVATIONS, CHALLENGES, AND GLOBAL PERSPECTIVES.
- Published in:
- Acta Scientiarum Polonorum: Architectura, 2024, v. 23, p. 287, doi. 10.22630/ASPA.2024.23.22
- By:
- Publication type:
- Article
THE BREEAM, THE LEED AND THE DGNB CERTIFICATIONS AS AN ASPECT OF SUSTAINABLE DEVELOPMENT.
- Published in:
- Acta Scientiarum Polonorum: Architectura, 2024, v. 23, p. 121, doi. 10.22630/ASPA.2024.23.9
- By:
- Publication type:
- Article
Strategies for Effective Waste Management in Hydropower Construction Projects.
- Published in:
- Renewable Energy & Sustainable Development, 2024, v. 10, n. 2, p. 366, doi. 10.21622/RESD.2024.10.2.1029
- By:
- Publication type:
- Article
Collapsible characteristics and prediction model of remodeled loess.
- Published in:
- Natural Hazards, 2025, v. 121, n. 2, p. 2245, doi. 10.1007/s11069-024-06804-w
- By:
- Publication type:
- Article
THE IMPORTANCE OF MULTIPLE ANALYTICAL STRUCTURES IN THE EVALUATION OF RISK EXPOSURES OF CONSTRUCTION PROJECTS.
- Published in:
- DIEM: Dubrovnik International Economic Meeting, 2024, v. 9, n. 1, p. 121, doi. 10.17818/DIEM/2024/1.8
- By:
- Publication type:
- Article
Guide for prioritization of project management processes (PMBoK) in vertical construction projects.
- Published in:
- Inge-Cuc, 2024, v. 20, n. 1, p. 156, doi. 10.17981/ingecuc.20.1.2024.08
- By:
- Publication type:
- Article
Generation of Early Warnings in the Identification of Changes in Deliverables in The Execution Stage of Construction Projects.
- Published in:
- Inge-Cuc, 2024, v. 20, n. 1, p. 51, doi. 10.17981/ingecuc.20.1.2024.04
- By:
- Publication type:
- Article
Construction Projects Duration Derivatives, Correlations Analysis Justified by Frequency Count and Questionnaire.
- Published in:
- SEA: Practical Application of Science, 2024, v. 12, n. 36, p. 229, doi. 10.70147/s36229241
- By:
- Publication type:
- Article
A Digital Simulation Game for Resource Management in Construction Projects.
- Published in:
- Electronic Journal of e-Learning, 2024, v. 22, n. 10, p. 1, doi. 10.34190/ejel.22.10.3495
- By:
- Publication type:
- Article
Influential Sustainable Factors Towards Construction Industry Projects in United Arab Emirates.
- Published in:
- Journal of Positive School Psychology, 2022, v. 6, n. 3, p. 4824
- By:
- Publication type:
- Article
Conceptual Framework of the Sustainable Factors towards Construction Industry Projects Sustainability in United Arab Emirates.
- Published in:
- Journal of Positive School Psychology, 2022, v. 6, n. 3, p. 4817
- By:
- Publication type:
- Article
The Impact Of Organizational Agility In Digital Transformation: A Field Research In The Ministry Of Higher Education And Scientific Research/Construction And Projects Department.
- Published in:
- Journal of Economics & Administrative Sciences, 2024, v. 30, n. 142, p. 163, doi. 10.33095/74hh6y88
- By:
- Publication type:
- Article
Significant Safety Factors Affecting the Safety Performance in Iraqi Construction Projects.
- Published in:
- Journal of Engineering (17264073), 2024, v. 30, n. 1, p. 41, doi. 10.31026/j.eng.2024.01.03
- By:
- Publication type:
- Article
Developing Crisis Management System for Construction Projects in Iraq.
- Published in:
- Journal of Engineering (17264073), 2022, v. 28, n. 1, p. 33, doi. 10.31026/j.eng.2022.01.03
- By:
- Publication type:
- Article
Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects.
- Published in:
- Journal of Engineering (17264073), 2018, v. 24, n. 7, p. 114, doi. 10.31026/j.eng.2018.07.08
- By:
- Publication type:
- Article
基于区块链的建筑工程项目供应链管理优化研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2024, v. 38, n. 5, p. 100, doi. 10.13991/j.cnki.jem.2024.05.017
- By:
- Publication type:
- Article
长输管道工程建设档案管理问题及对策研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2023, v. 37, n. 3, p. 142, doi. 10.13991/j.cnki.jem.2023.03.025
- By:
- Publication type:
- Article
建设工程项目施工阶段参与主体管理 行为三方演化博弈研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2023, v. 37, n. 2, p. 109, doi. 10.13991/j.cnki.jem.2023.02.019
- By:
- Publication type:
- Article
施工管理标准化对项目绩效的影响研究: 基于成员能力中介、任务可变性调节作用
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2023, v. 37, n. 2, p. 103, doi. 10.13991/j.cnki.jem.2023.02.018
- By:
- Publication type:
- Article
考虑环境责任的中小企业施工合同风险管理机制.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2023, v. 37, n. 1, p. 119, doi. 10.13991/j.cnki.jem.2023.01.021
- By:
- Publication type:
- Article
Process Analysis and Optimization of Modern General Hospital Projects Based on Lean Construction.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 5, p. 130, doi. 10.13991/j.cnki.jem.2022.05.023
- By:
- Publication type:
- Article
Comprehensive Model of Mega Power Project Management Based on System Thinking.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 5, p. 113, doi. 10.13991/j.cnki.jem.2022.05.020
- By:
- Publication type:
- Article
A Study on the Comprehensive multi-Objective Optimization of Construction Projects.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 5, p. 107, doi. 10.13991/j.cnki.jem.2022.05.019
- By:
- Publication type:
- Article
建筑业数字化转型阶段工程管理人才 培养教学改革研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 4, p. 153, doi. 10.13991/j.cnki.jem.2022.04.027
- By:
- Publication type:
- Article
基于可拓学的房地产开发项目进度风险评价.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 4, p. 117, doi. 10.13991/j.cnki.jem.2022.04.021
- By:
- Publication type:
- Article
基于MIV-SVM 的混凝土结构工程 质量控制模型应用研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 3, p. 147, doi. 10.13991/j.cnki.jem.2022.03.027
- By:
- Publication type:
- Article
基于系统思维的公路工程BIM 计量支付 集成管理研究与实践.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 3, p. 75, doi. 10.13991/j.cnki.jem.2022.03.014
- By:
- Publication type:
- Article
复杂建设项目质量管理复杂性测度研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2022, v. 36, n. 2, p. 108, doi. 10.13991/j.cnki.jem.2022.02.020
- By:
- Publication type:
- Article
装配式建筑项目施工质量控制影响因素研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2021, v. 35, n. 6, p. 119, doi. 10.13991/j.cnki.jem.2021.06.021
- By:
- Publication type:
- Article
IPD 模式下设计施工方合作动力演化分析.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2021, v. 35, n. 6, p. 113, doi. 10.13991/j.cnki.jem.2021.06.020
- By:
- Publication type:
- Article
设计院牵头的 EPC 模式合作关系博弈研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2021, v. 35, n. 6, p. 107, doi. 10.13991/j.cnki.jem.2021.06.019
- By:
- Publication type:
- Article
声誉机制下公众参与工程质量监管模式研究.
- Published in:
- Journal of Engineering Management / Gongcheng Guanli Xuebao, 2021, v. 35, n. 6, p. 102, doi. 10.13991/j.cnki.jem.2021.06.018
- By:
- Publication type:
- Article
PRIORITIZING ACCOUNTABILITY IN ARCHITECTURAL EDUCATION: TWO CASE STUDIES FROM DESIGNBUILDBLUFF.
- Published in:
- Dialectic, 2019, v. 7, p. 24
- By:
- Publication type:
- Article
EJPOVICKÉ TUNELY - BIM PRO NEJDELŠÍ ŽELEZNIČNÍ TUNELY V ČR.
- Published in:
- Tunel, 2019, v. 28, n. 2, p. 82
- By:
- Publication type:
- Article
Consider Finance and Operations as One Team.
- Published in:
- Journal: American Water Works Association, 2019, v. 111, n. 5, p. 60, doi. 10.1002/awwa.1292
- By:
- Publication type:
- Article
Understanding Critical Delay Events Affecting Schedule Performance in Indian Hydro-Electric Projects.
- Published in:
- Grenze International Journal of Engineering & Technology (GIJET), 2021, v. 7, n. 1, p. 245
- By:
- Publication type:
- Article
Model-based system engineering, an industrialization path for decommissioning projects by ASSYSTEM.
- Published in:
- EPJ Nuclear Sciences & Technologies, 2023, v. 9, p. 1, doi. 10.1051/epjn/2023008
- By:
- Publication type:
- Article
White, Everything White? Josef Frank's Villa Beer in Vienna and Its Materiality in the Context of the Discourse on 'White Cubes'.
- Published in:
- Architecture & Urbanism / Architektúra a Urbanizmus, 2019, v. 53, n. 1/2, p. 46
- By:
- Publication type:
- Article
System Dynamics Transforms Fluor Project and Change Management.
- Published in:
- Interfaces, 2012, v. 42, n. 1, p. 17, doi. 10.1287/inte.1110.0595
- By:
- Publication type:
- Article
Construction Project Management: Analysis of the Root Causes of Change in Low-Income Housing Projects in Egypt.
- Published in:
- Journal Architecture & Planning, 2016, v. 28, n. 1, p. 143
- By:
- Publication type:
- Article
PP112 Review On Change Management Models In Multi-Lateral, Multi-Stakeholder Contexts To Engage Stakeholders.
- Published in:
- International Journal of Technology Assessment in Health Care, 2021, v. 37, n. S1, p. 19, doi. 10.1017/S0266462321001136
- By:
- Publication type:
- Article
Bargaining Mechanism Design of PPP Project Bidding.
- Published in:
- GSTF Journal of Engineering Technology, 2017, v. 4, n. 3, p. 19, doi. 10.5176/2251-3701_4.3.199
- By:
- Publication type:
- Article
Study of Significant Factors Affecting Labor Productivity at Construction Sites in Jordan: Site Survey.
- Published in:
- GSTF Journal of Engineering Technology, 2016, v. 4, n. 1, p. 92, doi. 10.5176/2251-3701_4.1.178
- By:
- Publication type:
- Article
Evaluating Project Close-out for Sheet Metal and Mechanical Contractors through a Comparative Analysis.
- Published in:
- Professional Constructor: The Journal of the American Institute of Constructors, 2024, v. 49, n. 2, p. 24
- By:
- Publication type:
- Article
Computer-Integrated Construction Management with Procore.
- Published in:
- Professional Constructor: The Journal of the American Institute of Constructors, 2024, v. 49, n. 1, p. 50
- By:
- Publication type:
- Article
Educating the Construction Client: Training Strategy for Buyers of Commercial Design and Construction Services.
- Published in:
- Professional Constructor: The Journal of the American Institute of Constructors, 2022, v. 47, n. 1, p. 25
- By:
- Publication type:
- Article
Change Management in Construction: Necessity, Obstacles, and Suggested Solutions.
- Published in:
- Professional Constructor: The Journal of the American Institute of Constructors, 2020, v. 45, n. 2, p. 72
- By:
- Publication type:
- Article
Identifying Challenges to Project Outcomes from a Transportation Project Owner Perspective.
- Published in:
- Professional Constructor: The Journal of the American Institute of Constructors, 2020, v. 45, n. 2, p. 59
- By:
- Publication type:
- Article
PERT, CPM and the Tangled History of Network Scheduling.
- Published in:
- Professional Constructor: The Journal of the American Institute of Constructors, 2020, v. 45, n. 2, p. 6
- By:
- Publication type:
- Article