Works matching IS 1672948X AND DT 2024 AND VI 46 AND IP 2


Results: 16
    1
    2
    3
    4

    盾构法隧洞工程的施工进度预警方法.

    Published in:
    Journal of China Three Gorges University (Natural Sciences), 2024, v. 46, n. 2, p. 85, doi. 10.13393/j.cnki.issn.1672-948X.2024.02.013
    By:
    • 郭天衡;
    • 李 强;
    • 王长生;
    • 李子阳;
    • 王 文
    Publication type:
    Article
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16