EBSCO Logo
Connecting you to content on EBSCOhost
Results
Title

Determination of optimal part delivery dates in a stochastic assembly line.

Authors

Sarin, Subhash C.; Das, Sanchoy K.

Abstract

We consider the problem of determining the optimal part delivery dates of a low volume, small lot assembly line which manufactures large and costly products. Parts are assembled at each stage to a subassembly. The arrival time of an assembly part from a vendor is assumed to be a normally distributed random variable. A dynamic programming algorithm is developed to minimize work-in-process inventory of parts and subassemblies. It is implemented on the single job problem. Its further extensions to the multi-job case and to incorporate the cost of setting delivery dates are also discussed.

Subjects

ASSEMBLY line methods; PRODUCT management; MANUFACTURING processes; MANUFACTURED products; RANDOM variables; DYNAMIC programming; ALGORITHMS

Publication

International Journal of Production Research, 1987, Vol 25, Issue 7, p1013

ISSN

0020-7543

Publication type

Academic Journal

DOI

10.1080/00207548708919892

EBSCO Connect | Privacy policy | Terms of use | Copyright | Manage my cookies
Journals | Subjects | Sitemap
© 2025 EBSCO Industries, Inc. All rights reserved