Works matching DE "LEAD time (Project management)"
Results: 73
Using simulation for process reengineering in refractory ceramics manufacturing-a case study.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2017, v. 93, n. 5-8, p. 1761, doi. 10.1007/s00170-017-0602-9
- By:
- Publication type:
- Article
Determination of Optimum Frame Rates for Observation of Construction Operations from Time-Lapse Movies.
- Published in:
- Journal of Engineering, Project & Production Management, 2012, v. 2, n. 2, p. 57, doi. 10.32738/jeppm.201207.0002
- By:
- Publication type:
- Article
Factors Affecting Time Overrun in Road Construction Projects in District Swabi: Contractor's Perspective.
- Published in:
- Journal of Managerial Sciences, 2017, v. 11, p. 387
- By:
- Publication type:
- Article
Improving Patient Flow Utilizing a Collaborative Learning Model.
- Published in:
- 2016
- By:
- Publication type:
- journal article
Inventory models with nonlinear shortage costs and stochastic lead times; applications of shape properties of randomly stopped counting processes.
- Published in:
- Naval Research Logistics, 2015, v. 62, n. 5, p. 345, doi. 10.1002/nav.21637
- By:
- Publication type:
- Article
Stein-Chen approximation and error bounds for order fill rates in assemble-to-order systems.
- Published in:
- Naval Research Logistics, 2012, v. 59, n. 8, p. 643, doi. 10.1002/nav.21514
- By:
- Publication type:
- Article
Probabilistic solution and bounds for serial inventory systems with discounted and average costs.
- Published in:
- Naval Research Logistics, 2007, v. 54, n. 6, p. 623, doi. 10.1002/nav.20234
- By:
- Publication type:
- Article
MATHEMATICAL PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS: REVIEW, FORMULATION AND PROBLEM REDUCTION.
- Published in:
- Management Science, 1983, v. 29, n. 10, p. 1126, doi. 10.1287/mnsc.29.10.1126
- By:
- Publication type:
- Article
ROLLING HORIZON PROCEDURES FOR THE FACILITIES IN SERIES INVENTORY MODEL WITH NESTED SCHEDULES.
- Published in:
- Management Science, 1983, v. 29, n. 2, p. 237, doi. 10.1287/mnsc.29.2.237
- By:
- Publication type:
- Article
ON EXPERIMENTAL DESIGNS FOR COMPUTER SIMULATION EXPERIMENTS.
- Published in:
- Management Science, 1972, v. 18, n. 7, p. 384, doi. 10.1287/mnsc.18.7.384
- By:
- Publication type:
- Article
A DYNAMIC INVENTORY MODEL WITH STOCHASTIC LEAD TIMES.
- Published in:
- Management Science, 1970, v. 16, n. 7, p. 491, doi. 10.1287/mnsc.16.7.491
- By:
- Publication type:
- Article
ON THE EQUIVALENCE OF SOME INVENTORY SYSTEMS.
- Published in:
- Management Science, 1963, v. 9, n. 3, p. 482, doi. 10.1287/mnsc.9.3.482
- By:
- Publication type:
- Article
A FAMILY OF DYNAMIC INVENTORY MODELS .
- Published in:
- Management Science, 1962, v. 8, n. 4, p. 458, doi. 10.1287/mnsc.8.4.458
- By:
- Publication type:
- Article
Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects.
- Published in:
- Journal of Construction Engineering & Management, 2014, v. 140, n. 2, p. -1, doi. 10.1061/(ASCE)CO.1943-7862.0000804
- Publication type:
- Article
Enabling Customization Using Standard Operations.
- Published in:
- California Management Review, 2001, v. 43, n. 3, p. 125, doi. 10.2307/41166092
- By:
- Publication type:
- Article
The Use of Stakeholder Analysis to Understand Ethical and Moral Issues in the Primary Resource Sector.
- Published in:
- Journal of Business Ethics, 1995, v. 14, n. 8, p. 653, doi. 10.1007/BF00871346
- By:
- Publication type:
- Article
A demand classification scheme for spare part inventory model subject to stochastic demand and lead time.
- Published in:
- Production Planning & Control, 2015, v. 26, n. 16, p. 1318, doi. 10.1080/09537287.2015.1033497
- By:
- Publication type:
- Article
The extent of knowledge of Quick Response Manufacturing principles: an exploratory transnational study.
- Published in:
- International Journal of Production Research, 2017, v. 55, n. 17, p. 4891, doi. 10.1080/00207543.2016.1268729
- By:
- Publication type:
- Article
Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands.
- Published in:
- International Journal of Production Research, 2017, v. 55, n. 16, p. 4816, doi. 10.1080/00207543.2017.1310402
- By:
- Publication type:
- Article
Integration and application of feature recognition and mould manufacturing planning navigating process.
- Published in:
- 2014
- By:
- Publication type:
- Case Study
Efficient development of cycle time response surfaces using progressive simulation metamodeling.
- Published in:
- International Journal of Production Research, 2014, v. 52, n. 10, p. 3097, doi. 10.1080/00207543.2013.864055
- By:
- Publication type:
- Article
Logical reconfiguration of reconfigurable manufacturing systems with stream of variations modelling: a stochastic two-stage programming and shortest path model.
- Published in:
- International Journal of Production Research, 2014, v. 52, n. 5, p. 1401, doi. 10.1080/00207543.2013.843798
- By:
- Publication type:
- Article
Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 15, p. 4502, doi. 10.1080/00207543.2013.774485
- By:
- Publication type:
- Article
Improving manufacturing lead time using holistic approach to planning and execution with integrated data structures: numerical simulation and comparison.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 15, p. 4484, doi. 10.1080/00207543.2013.765076
- By:
- Publication type:
- Article
Risk modelling and assessment for distributed manufacturing system.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 9, p. 2652, doi. 10.1080/00207543.2012.738943
- By:
- Publication type:
- Article
Aggregate production planning for shipbuilding with variation-inventory trade-offs.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
An analytical framework for evaluating the value of enhanced customisation: an integrated operations-marketing perspective.
- Published in:
- International Journal of Production Research, 2011, v. 49, n. 19, p. 5779, doi. 10.1080/00207543.2010.519738
- By:
- Publication type:
- Article
Non-exhaustive family based dispatching heuristics-exploiting variances of processing and set-up times.
- Published in:
- International Journal of Production Research, 2010, v. 48, n. 13, p. 3783, doi. 10.1080/00207540902927926
- By:
- Publication type:
- Article
Kanban-based pull systems with advance demand information.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 12, p. 3139, doi. 10.1080/00207540701739589
- By:
- Publication type:
- Article
CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 11, p. 2921, doi. 10.1080/00207540701725059
- By:
- Publication type:
- Article
An explicit analysis of the lead time syndrome: stability condition and performance evaluation.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 9, p. 2507, doi. 10.1080/00207540701420552
- By:
- Publication type:
- Article
Method of buffering critical resources in make-to-order shop floor control in manufacturing complex products.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 8, p. 2125, doi. 10.1080/00207540802572582
- By:
- Publication type:
- Article
A prediction of the dielectric constant of multi-layer ceramic capacitors using the mega-trend-diffusion technique in powder pilot runs: case study.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 1, p. 51, doi. 10.1080/00207540701439586
- By:
- Publication type:
- Article
A market-driven approach to product family design.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 1, p. 71, doi. 10.1080/00207540701393171
- By:
- Publication type:
- Article
PROCEDURE PHASES FOR CONFIGURATION SYSTEM DEVELOPMENT.
- Published in:
- Annals of DAAAM & Proceedings, 2015, v. 26, n. 1, p. 0478, doi. 10.2507/26th.daaam.proceedings.063
- By:
- Publication type:
- Article
MOKA ONTOLOGY VARIANT TO APPLY TO THE INSPECTION PLANNING PROCESS IN A KBE SYSTEM.
- Published in:
- Annals of DAAAM & Proceedings, 2009, p. 1471
- By:
- Publication type:
- Article
PROPOZYCJA NOWEGO ALGORYTMU W ANALIZIE CZASOWO-KOSZTOWEJ PRZEDSIĘWZIĘĆ.
- Published in:
- Operations Research & Decisions, 2006, n. 3/4, p. 5
- By:
- Publication type:
- Article
Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing.
- Published in:
- Journal of Intelligent Manufacturing, 2012, v. 23, n. 6, p. 2151, doi. 10.1007/s10845-011-0561-1
- By:
- Publication type:
- Article
Inventories with Multiple Supply Sources and Networks of Queues with Overflow Bypasses.
- Published in:
- Management Science, 2009, v. 55, n. 3, p. 362, doi. 10.1287/mnsc.1080.0941
- By:
- Publication type:
- Article
Asymptotic Optimality of Order-Up-To Policies in Lost Sales Inventory Systems.
- Published in:
- Management Science, 2009, v. 55, n. 3, p. 404, doi. 10.1287/mnsc.1080.0945
- By:
- Publication type:
- Article
Note: How Does Product Proliferation Affect Responsiveness?
- Published in:
- Management Science, 1998, v. 44, n. 7, p. 1017, doi. 10.1287/mnsc.44.7.1017
- By:
- Publication type:
- Article
A NOTE ON THE DYNAMIC LOT-SIZE MODEL WITH UNCERTAINTY IN DEMAND AND SUPPLY PROCESSES.
- Published in:
- Management Science, 1989, v. 35, n. 5, p. 635, doi. 10.1287/mnsc.35.5.635
- By:
- Publication type:
- Article
PRODUCTION LEAD TIME VARIABILITY SIMULATION - INSIGHTS FROM A CASE STUDY.
- Published in:
- International Journal of Industrial Engineering, 2012, v. 19, n. 5, p. 213
- By:
- Publication type:
- Article
What You Should Know About Megaprojects and Why: An Overview.
- Published in:
- Project Management Journal, 2014, v. 45, n. 2, p. 6, doi. 10.1002/pmj.21409
- By:
- Publication type:
- Article
Making Mid-Course Corrections to Improve Project Management.
- Published in:
- Contract Management, 2011, v. 51, n. 7, p. 52
- By:
- Publication type:
- Article
Complexity in ISFA (in-service fluid analysis): Part XXXII.
- Published in:
- Tribology & Lubrication Technology, 2017, v. 73, n. 5, p. 86
- By:
- Publication type:
- Article
Impacts of concurrency, iteration, design review, and problem complexity on design project lead time and error generation.
- Published in:
- Concurrent Engineering: Research & Applications, 2012, v. 20, n. 1, p. 55, doi. 10.1177/1063293X11435177
- By:
- Publication type:
- Article
Evaluation of Chinese E-Commerce Cost and Lead Time Performance to Estonia.
- Published in:
- Quality Innovation Prosperity / Kvalita Inovácia Prosperita, 2018, v. 22, n. 1, p. 14, doi. 10.12776/QIP.V22I1.1035
- By:
- Publication type:
- Article
BUILDING AN AUTOMATED TASK DELEGATION ALGORITHM FOR PROJECT MANAGEMENT AND DEPLOYING IT AS SAAS.
- Published in:
- Studia Universitatis Babes-Bolyai, Informatica, 2013, v. 58, n. 1, p. 58
- By:
- Publication type:
- Article
The Effect of Longer Development Times on Product Pipeline Management Performance.
- Published in:
- RAC: Revista de Administração Contemporânea, 2015, v. 19, n. 4, p. 461, doi. 10.1590/1982-7849rac20151430
- By:
- Publication type:
- Article