Works matching IS 02698889 AND DT 2016 AND VI 31 AND IP 5
Results: 9
A cooperative search for berth scheduling.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 498, doi. 10.1017/S0269888916000266
- By:
- Publication type:
- Article
Introduction to the special issue on constraint satisfaction for planning and scheduling.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 415, doi. 10.1017/S0269888917000017
- By:
- Publication type:
- Article
A metaheuristic technique for energy-efficiency in job-shop scheduling.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 475, doi. 10.1017/S026988891600031X
- By:
- Publication type:
- Article
A constraint-based approach for planning unmanned aerial vehicle activities.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 486, doi. 10.1017/S0269888916000291
- By:
- Publication type:
- Article
Comparing planning problem compilation approaches for quantum annealing.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 465, doi. 10.1017/S0269888916000278
- By:
- Publication type:
- Article
Logic-based Benders decomposition for planning and scheduling: a computational analysis.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 440, doi. 10.1017/S0269888916000254
- By:
- Publication type:
- Article
Revisiting dynamic constraint satisfaction for model-based planning.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 429, doi. 10.1017/S0269888916000242
- By:
- Publication type:
- Article
The RANTANPLAN planner: system description.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 452, doi. 10.1017/S0269888916000229
- By:
- Publication type:
- Article
Parallel heuristic search in forward partial-order planning.
- Published in:
- Knowledge Engineering Review, 2016, v. 31, n. 5, p. 417, doi. 10.1017/S0269888916000230
- By:
- Publication type:
- Article