Works matching IS 10946136 AND DT 2013 AND VI 16 AND IP 2


Results: 7
    1
    2

    Job-shop scheduling in a body shop.

    Published in:
    Journal of Scheduling, 2013, v. 16, n. 2, p. 215, doi. 10.1007/s10951-012-0300-2
    By:
    • Schauer, Joachim;
    • Schwarz, Cornelius
    Publication type:
    Article
    3
    4
    5
    6
    7

    Scheduling to minimize gaps and power consumption.

    Published in:
    Journal of Scheduling, 2013, v. 16, n. 2, p. 151, doi. 10.1007/s10951-012-0309-6
    By:
    • Demaine, Erik;
    • Ghodsi, Mohammad;
    • Hajiaghayi, MohammadTaghi;
    • Sayedi-Roshkhar, Amin;
    • Zadimoghaddam, Morteza
    Publication type:
    Article