Works matching IS 02545330 AND DT 2008 AND VI 159 AND IP 1


Results: 27
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13

    Fuzzy job shop scheduling with lot-sizing.

    Published in:
    Annals of Operations Research, 2008, v. 159, n. 1, p. 275, doi. 10.1007/s10479-007-0287-9
    By:
    • Petrovic, Sanja;
    • Fayad, Carole;
    • Petrovic, Dobrila;
    • Burke, Edmund;
    • Kendall, Graham
    Publication type:
    Article
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27

    Preface.

    Published in:
    2008
    By:
    • Kendall, Graham;
    • Lei Lei;
    • Pinedo, Michael
    Publication type:
    Editorial