Works matching IS 01716468 AND DT 2010 AND VI 32 AND IP 2
Results: 7
Managing and modelling general resource transfers in (multi-)project scheduling.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 369, doi. 10.1007/s00291-008-0144-5
- By:
- Publication type:
- Article
Look-ahead strategies for dynamic pickup and delivery problems.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 395, doi. 10.1007/s00291-008-0146-3
- By:
- Publication type:
- Article
Efficient reformulations for dynamic lot-sizing problems with product substitution.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 263, doi. 10.1007/s00291-008-0148-1
- By:
- Publication type:
- Article
Dynamic capacitated lot-sizing problems: a classification and review of solution approaches.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 231, doi. 10.1007/s00291-008-0150-7
- By:
- Publication type:
- Article
Component allocation and ordering policy in a multi-component, multi-product assembled to stock system.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 293, doi. 10.1007/s00291-009-0166-7
- By:
- Publication type:
- Article
An optimal constant level rationing policy under service level constraints.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 319, doi. 10.1007/s00291-009-0167-6
- By:
- Publication type:
- Article
Scheduling and staffing multiple projects with a multi-skilled workforce.
- Published in:
- OR Spectrum, 2010, v. 32, n. 2, p. 343, doi. 10.1007/s00291-009-0169-4
- By:
- Publication type:
- Article