Found: 585
Select item for more details and to access through your institution.
Form and Function: High-tech tools and an elevator display are showcased.
- Published in:
- Elevator World, 2024, v. 72, n. 11, p. 114
- Publication type:
- Article
EXPERT ANSWERS: SUBJECT MATTER EXPERTS TAKE ON YOUR QUALITY-RELATED QUERIES.
- Published in:
- Quality Progress, 2024, v. 57, n. 9, p. 6
- By:
- Publication type:
- Article
Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2011, v. 53, n. 1-4, p. 353, doi. 10.1007/s00170-010-2824-y
- By:
- Publication type:
- Article
A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 49, n. 5-8, p. 697, doi. 10.1007/s00170-009-2419-7
- By:
- Publication type:
- Article
Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 48, n. 9-12, p. 1123, doi. 10.1007/s00170-009-2360-9
- By:
- Publication type:
- Article
Scheduling with past-sequence-dependent setup times and learning effects on a single machine.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 48, n. 5-8, p. 739, doi. 10.1007/s00170-009-2308-0
- By:
- Publication type:
- Article
Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 48, n. 5-8, p. 719, doi. 10.1007/s00170-009-2314-2
- By:
- Publication type:
- Article
Two-agent group scheduling with deteriorating jobs on a single machine.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 47, n. 5-8, p. 657, doi. 10.1007/s00170-009-2224-3
- By:
- Publication type:
- Article
Scheduling jobs on dynamic parallel machines with sequence-dependent setup times.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 47, n. 5-8, p. 773, doi. 10.1007/s00170-009-2203-8
- By:
- Publication type:
- Article
Minimizing total flow time subject to preemption penalties in online scheduling.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 47, n. 1-4, p. 227, doi. 10.1007/s00170-009-2190-9
- By:
- Publication type:
- Article
Single-machine scheduling with a sum-of-processing-time based learning effect and deteriorating jobs.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 45, n. 3/4, p. 336, doi. 10.1007/s00170-009-1950-x
- By:
- Publication type:
- Article
Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 44, n. 11/12, p. 1204, doi. 10.1007/s00170-008-1917-3
- By:
- Publication type:
- Article
Single machine group scheduling with general linear deterioration to minimize the makespan.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 43, n. 1/2, p. 146, doi. 10.1007/s00170-008-1667-2
- By:
- Publication type:
- Article
Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 43, n. 1/2, p. 161, doi. 10.1007/s00170-008-1692-1
- By:
- Publication type:
- Article
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 41, n. 11/12, p. 1186, doi. 10.1007/s00170-008-1569-3
- By:
- Publication type:
- Article
Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 41, n. 11/12, p. 1221, doi. 10.1007/s00170-008-1512-7
- By:
- Publication type:
- Article
No-wait flowshop with separate setup times to minimize maximum lateness.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2007, v. 35, n. 5/6, p. 551, doi. 10.1007/s00170-006-0726-9
- By:
- Publication type:
- Article
Single setup multiple delivery model of JIT system.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2007, v. 33, n. 11/12, p. 1222, doi. 10.1007/s00170-006-0558-7
- By:
- Publication type:
- Article
Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2007, v. 33, n. 3/4, p. 334, doi. 10.1007/s00170-006-0466-x
- By:
- Publication type:
- Article
A reinforcement learning approach for developing routing policies in multi-agent production scheduling.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2007, v. 33, n. 3/4, p. 323, doi. 10.1007/s00170-006-0465-y
- By:
- Publication type:
- Article
Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2006, v. 30, n. 1/2, p. 105, doi. 10.1007/s00170-005-0022-0
- By:
- Publication type:
- Article
The combination of non-contrast abbreviated MRI and alpha foetoprotein has high performance for hepatocellular carcinoma screening.
- Published in:
- European Radiology, 2023, v. 33, n. 10, p. 6929, doi. 10.1007/s00330-023-09906-4
- By:
- Publication type:
- Article
Gadoxetate-enhanced abbreviated MRI is highly accurate for hepatocellular carcinoma screening.
- Published in:
- European Radiology, 2020, v. 30, n. 11, p. 6003, doi. 10.1007/s00330-020-07014-1
- By:
- Publication type:
- Article
A novel hybrid archimedes optimization algorithm for energy-efficient hybrid flow shop scheduling.
- Published in:
- International Journal of Advances in Intelligent Informatics, 2022, v. 8, n. 2, p. 237, doi. 10.26555/ijain.v8i2.724
- By:
- Publication type:
- Article
Intraoperative nerve monitoring in thyroid surgery: Analysis of recurrent laryngeal nerve identification and operative time.
- Published in:
- Laryngoscope Investigative Otolaryngology, 2021, v. 6, n. 2, p. 354, doi. 10.1002/lio2.543
- By:
- Publication type:
- Article
Strategic Analysis of Retrial Queues with Setup Times, Breakdown and Repairs.
- Published in:
- Discrete Dynamics in Nature & Society, 2023, p. 1, doi. 10.1155/2023/4930414
- By:
- Publication type:
- Article
Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry).
- Published in:
- Discrete Dynamics in Nature & Society, 2022, p. 1, doi. 10.1155/2022/8962052
- By:
- Publication type:
- Article
A New Approach Based on the Learning Effect for Sequence-Dependent Parallel Machine Scheduling Problem under Uncertainty.
- Published in:
- Discrete Dynamics in Nature & Society, 2022, p. 1, doi. 10.1155/2022/2648936
- By:
- Publication type:
- Article
Implementation of a Pull System – A Case Study of a Polymeric Production System for the Automotive Industry.
- Published in:
- Management Systems in Production Engineering, 2021, v. 29, n. 4, p. 253, doi. 10.2478/mspe-2021-0031
- By:
- Publication type:
- Article
Cotton yield prediction using drone derived LAI and chlorophyll content.
- Published in:
- Journal of Agrometeorology, 2022, v. 24, n. 4, p. 348, doi. 10.54386/jam.v24i4.1770
- By:
- Publication type:
- Article
A comparison of handheld and standard ultrasound in Swiss medical students.
- Published in:
- World Journal of Emergency Medicine, 2022, v. 13, n. 2, p. 85, doi. 10.5847/wjem.j.1920-8642.2022.017
- By:
- Publication type:
- Article
q-SERIES IN MARKOV CHAINS WITH BINOMIAL TRANSITIONS.
- Published in:
- Probability in the Engineering & Informational Sciences, 2009, v. 23, n. 1, p. 75, doi. 10.1017/S0269964809000084
- Publication type:
- Article
P10‐24: Successful extubation in a phenobarbital overdose attempted suicide in a non‐ideal set‐up at the time of COVID 19 pandemic.
- Published in:
- Respirology, 2021, v. 26, p. 407, doi. 10.1111/resp.14150_811
- Publication type:
- Article
P10‐24: Successful extubation in a phenobarbital overdose attempted suicide in a non‐ideal set‐up at the time of COVID 19 pandemic.
- Published in:
- Respirology, 2021, v. 26, p. 407, doi. 10.1111/resp.14150_811
- Publication type:
- Article
Stroke survivor perceptions of using an exoskeleton during acute gait rehabilitation.
- Published in:
- Scientific Reports, 2022, v. 12, n. 1, p. 1, doi. 10.1038/s41598-022-18188-7
- By:
- Publication type:
- Article
Stroke survivor perceptions of using an exoskeleton during acute gait rehabilitation.
- Published in:
- Scientific Reports, 2022, v. 12, n. 1, p. 1, doi. 10.1038/s41598-022-18188-7
- By:
- Publication type:
- Article
Bin packing problem with restricted item fragmentation: Assignment of jobs in multi-product assembly environment with overtime.
- Published in:
- International Journal of Optimization & Control: Theories & Applications, 2024, v. 14, n. 1, p. 32, doi. 10.11121/ijocta.1435
- By:
- Publication type:
- Article
PANDA Phase One: PANDA collaboration.
- Published in:
- European Physical Journal A -- Hadrons & Nuclei, 2021, v. 57, n. 6, p. 1, doi. 10.1140/epja/s10050-021-00475-y
- By:
- Publication type:
- Article
Solving the two-machine open shop problem with a single server with respect to the makespan.
- Published in:
- Annals of Operations Research, 2024, v. 338, n. 2/3, p. 857, doi. 10.1007/s10479-024-06097-z
- By:
- Publication type:
- Article
Correction: N-list-enhanced heuristic for distributed three-stage assembly permutation flow shop scheduling.
- Published in:
- 2024
- By:
- Publication type:
- Correction Notice
Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups.
- Published in:
- Annals of Operations Research, 2023, v. 322, n. 1, p. 125, doi. 10.1007/s10479-022-04537-2
- By:
- Publication type:
- Article
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network.
- Published in:
- Annals of Operations Research, 2023, v. 321, n. 1/2, p. 469, doi. 10.1007/s10479-022-04783-4
- By:
- Publication type:
- Article
Simheuristic algorithm for a stochastic parallel machine scheduling problem with periodic re-planning assessment.
- Published in:
- Annals of Operations Research, 2023, v. 320, n. 2, p. 547, doi. 10.1007/s10479-022-04534-5
- By:
- Publication type:
- Article
Parallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deterioration.
- Published in:
- Annals of Operations Research, 2021, v. 298, n. 1/2, p. 407, doi. 10.1007/s10479-020-03555-2
- By:
- Publication type:
- Article
Single-machine serial-batch delivery scheduling with two competing agents and due date assignment.
- Published in:
- Annals of Operations Research, 2021, v. 298, n. 1/2, p. 497, doi. 10.1007/s10479-018-2839-6
- By:
- Publication type:
- Article
On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time.
- Published in:
- Annals of Operations Research, 2021, v. 296, n. 1/2, p. 615, doi. 10.1007/s10479-019-03490-x
- By:
- Publication type:
- Article
Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems.
- Published in:
- Annals of Operations Research, 2020, v. 295, n. 2, p. 695, doi. 10.1007/s10479-020-03764-9
- By:
- Publication type:
- Article
Delay performance of data-center queue with setup policy and abandonment.
- Published in:
- Annals of Operations Research, 2020, v. 293, n. 1, p. 269, doi. 10.1007/s10479-019-03268-1
- By:
- Publication type:
- Article
Production planning and scheduling optimization model: a case of study for a glass container company.
- Published in:
- Annals of Operations Research, 2020, v. 286, n. 1/2, p. 529, doi. 10.1007/s10479-018-3099-1
- By:
- Publication type:
- Article
Modeling and solving for bi-objective cutting parallel machine scheduling problem.
- Published in:
- Annals of Operations Research, 2020, v. 285, n. 1/2, p. 223, doi. 10.1007/s10479-019-03208-z
- By:
- Publication type:
- Article