Found: 6
Select item for more details and to access through your institution.
Models for estimation of TBM performance in granitic and mica gneiss hard rocks in a hydropower tunnel.
- Published in:
- Bulletin of Engineering Geology & the Environment, 2017, v. 76, n. 4, p. 1627, doi. 10.1007/s10064-016-0950-y
- By:
- Publication type:
- Article
Doha Metro Green Line - Six tunnel boring machines in the starting phase / Metro Doha Green Line - Sechs Tunnelvortriebsmaschinen in der Startphase.
- Published in:
- Geomechanik und Tunnelbau, 2014, v. 7, n. 6, p. 655, doi. 10.1002/geot.201400060
- By:
- Publication type:
- Article
Comparison of the mechanical performance between two-stage and flat-face cutter head for the rock tunnel boring machine (TBM).
- Published in:
- Journal of Mechanical Science & Technology, 2015, v. 29, n. 5, p. 2047, doi. 10.1007/s12206-015-0425-2
- By:
- Publication type:
- Article
Ground freezing to repair leaks in slurry wall shaft.
- Published in:
- Mining Engineering, 2016, v. 68, n. 9, p. 24
- By:
- Publication type:
- Article
Settlements Due to Single and Twin Tube Urban EPB Shield Tunnelling.
- Published in:
- Geotechnical & Geological Engineering, 2015, v. 33, n. 3, p. 487, doi. 10.1007/s10706-014-9835-7
- By:
- Publication type:
- Article
Performance Evaluation of Hard Rock TBMs considering Operational and Rock Conditions.
- Published in:
- Shock & Vibration, 2018, p. 1, doi. 10.1155/2018/8798232
- By:
- Publication type:
- Article