ANÁLISE DOS ADITIVOS DE PRAZO E VALOR DOS CONTRATOS DE OBRAS EM UMA INSTITUIÇÃO DE ENSINO FEDERAL.
- Authors
Ribeiro de Oliveira, Daniel; do Nascimento de Souto, Edenilson
- Abstract
This article aims to carry out an analysis of the construction amendments to the construction contracts of the Federal Rural University of Rio de Janeiro - UFRRJ. To this end, what is discussed on the topic was surveyed and a survey was carried out with the works contracts signed between the years 2017 and 2021. From the bibliographical survey it was possible to identify that the occurrence of additives is something common and that in the majority of cases is related to the lack of hiring planning. In the method, data was extracted using the university's Integrated Heritage, Administration and Contracts System - SIPAC, in which the original processes of each work were consulted in its digital format. In addition to the contract that formalized the work, other information was consulted, such as the requests for additives themselves, the motivations used in these requests and the handouts of the works carried out. The study showed that among the 44 works contracts analyzed, 103 contract amendments were signed. In the extensions concluded, the result had an average of 141% of the term added during execution and 87.36% of the additional term added during the term of the contract, percentages calculated based on the deadlines originally defined in the works. Among the service additions, it was demonstrated that over the 5-year period a total of R$ 4,015,304.90 was invested. Finally, the motivations used in requests for additives were demonstrated, in which the cause that most frequently occurred was related to changes in projects and the addition of items, with a total of 21 motivations out of a total of 65 consulted, representing a total of 40 % of motivations used. The analysis of this data was relevant to understand, in values, the financial impact generated from the celebrations of amendments in the period. It also highlighted the recurrence of extensions of university works, in addition to listing the motivations used in these requests for amendments. Finally, this study concluded that the works can be better monitored through continuous inspection of the works and good planning for contracting the work, in addition to proposing an addendum request form in order to standardize addendum requests at the university.
- Subjects
CONTRACT management; UNIVERSITY extension; CONSTRUCTION contracts; CONTRACTING out; DATA analysis
- Publication
Revista Foco (Interdisciplinary Studies Journal), 2024, Vol 17, Issue 5, p1
- ISSN
1981-223X
- Publication type
Article
- DOI
10.54751/revistafoco.v17n5-014