Found: 15
Select item for more details and to access through your institution.
A note on “A comparative evaluation of assembly line balancing heuristics”.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 44, n. 7/8, p. 817, doi. 10.1007/s00170-008-1891-9
- By:
- Publication type:
- Article
Equilibrado de lineas de montaje con ventanas de visibilidad.
- Published in:
- DYNA - Ingeniería e Industria, 2014, v. 89, n. 5, p. 552, doi. 10.6036/7051
- By:
- Publication type:
- Article
Cóctel de heurísticas para resolver problemas difíciles.
- Published in:
- DYNA - Ingeniería e Industria, 2012, v. 87, n. 3, p. 275
- By:
- Publication type:
- Article
Using optimal control to optimize the extraction rate of a durable non-renewable resource with a monopolistic primary supplier.
- Published in:
- Journal of Industrial & Management Optimization, 2022, v. 18, n. 5, p. 3233, doi. 10.3934/jimo.2021110
- By:
- Publication type:
- Article
Technical Note: Relating to the Parameter Values Given by Nelder and Mead in their Algorithm.
- Published in:
- Computer Journal, 2015, v. 58, n. 1, p. 157, doi. 10.1093/comjnl/bxt150
- By:
- Publication type:
- Article
Regio- and Stereoselective Synthesis of Acetallic Tetrahydropyrans as Building Blocks for Natural Products Preparation, via a Tandem [4+3]-Cycloaddition/Ozonolysis Process.
- Published in:
- European Journal of Organic Chemistry, 2016, v. 2016, n. 27, p. 4674, doi. 10.1002/ejoc.201600590
- By:
- Publication type:
- Article
A branch and bound algorithm for the response time variability problem.
- Published in:
- Journal of Scheduling, 2013, v. 16, n. 2, p. 243, doi. 10.1007/s10951-012-0277-x
- By:
- Publication type:
- Article
Response time variability.
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 2, p. 97, doi. 10.1007/s10951-006-0002-8
- By:
- Publication type:
- Article
Success92: A DSS for Scheduling the Olympic Games.
- Published in:
- Interfaces, 1989, v. 19, n. 5, p. 1, doi. 10.1287/inte.19.5.1
- By:
- Publication type:
- Article
Planning production and working time within an annualised hours scheme framework.
- Published in:
- Annals of Operations Research, 2007, v. 155, n. 1, p. 5, doi. 10.1007/s10479-007-0211-3
- By:
- Publication type:
- Article
Planning Annualised Hours with a Finite Set of Weekly Working Hours and Joint Holidays.
- Published in:
- Annals of Operations Research, 2004, v. 128, n. 1-4, p. 217, doi. 10.1023/B:ANOR.0000019106.52631.ff
- By:
- Publication type:
- Article
Multi-Step Process for Selecting Strategic Sourcing Options when Designing Supply Chains.
- Published in:
- Journal of Industrial Engineering & Management, 2021, v. 14, n. 3, p. 477, doi. 10.3926/jiem.3391
- By:
- Publication type:
- Article
Assigning Orders to Suppliers with Linear Piecewise Concave Costs.
- Published in:
- Journal of Industrial Engineering & Management, 2019, v. 12, n. 3, p. 421, doi. 10.3926/jiem.2820
- By:
- Publication type:
- Article
Computing Voter Transitions: The Elections for the Catalan Parliament, from 2010 to 2012.
- Published in:
- Journal of Industrial Engineering & Management, 2015, v. 8, n. 1, p. 122, doi. 10.3926/jiem.1189
- By:
- Publication type:
- Article
LETRIS: staffing service systems by means of simulation.
- Published in:
- Journal of Industrial Engineering & Management, 2012, v. 5, n. 2, p. 285, doi. 10.3926/jiem.219
- By:
- Publication type:
- Article