We found a match
Your institution may have rights to this item. Sign in to continue.
- Title
ESTRUTURAÇÃO DO PLANO DE CONTINGÊNCIA E EMERGÊNCIA AMBIENTAL: ESTUDO DE CASO DE UMA SUBESTAÇÃO DE ENERGIA ELÉTRICA.
- Authors
Vieira Costa, Leonardo Pastorin; Rios de Almeida, Vanessa Fernanda; Marques de Almeida, Ernani; Cutrim Vital, Wellyn; Leite de Oliveira, José Nilton
- Abstract
A substation is an electrical energy installation consisting of a set of equipment that has the function of transmission and distribution of electrical energy. The substation of the present study is located in Abunã-RO. In the case of a power substation, it is noted that in its construction and/or operation phase, a possible incident may occur. According to Gonçalves (2005), an incident in civil construction can be defined as an unplanned event that occurs at the construction site and that can result in injury, illness, death, property damage or financial loss. To reduce losses and damages, the Environmental Contingency and Emergency Plan - PCEA, is a Workplace Safety tool, with pre-defined actions to respond to an occasioned emergency. The tool works like a manual, in order to distinguish the areas and their possible contingencies. The structuring of the PCEA took place through training and guidance, enabling a quick action by the team in the face of an accident or incident at the work, with the aim of reducing damage and human and material losses, consequently recommending the lives of its members. As a result, compliance with the measures present in this work provides a quick response in case of accidents and incidents, allowing better chances of survival for those present at the work.
- Subjects
BUILDING sites; INDUSTRIAL safety; ELECTRICAL energy; MANUAL labor; EMERGENCY management
- Publication
Revista Foco (Interdisciplinary Studies Journal), 2023, Vol 16, Issue 5, p1
- ISSN
1981-223X
- Publication type
Article
- DOI
10.54751/revistafoco.v16n5-076