We found a match
Your institution may have rights to this item. Sign in to continue.
- Title
Correction: N-list-enhanced heuristic for distributed three-stage assembly permutation flow shop scheduling.
- Authors
Ying, Kuo-Ching; Pourhejazy, Pourya; Fu, Po-Jui
- Abstract
The online version of the original article can be found at https://doi.org/10.1007/s10479-023-05456-6Annals of Operations Researchhttps://doi.org/10.1007/s10479-023-05456-6Article was incorrectly published with proofing error related with citations of : "J. Wang, Lei, & Li, 2022a, 2022b" and needs to be read as "J. Wang, Lei, & Li, [1]".Original article has been updated.Publisher's NoteSpringer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.By Kuo-Ching Ying; Pourya Pourhejazy and Po-Jui FuReported by Author; Author; Author
- Subjects
FLOW shop scheduling; PERMUTATIONS; HEURISTIC; BEES algorithm; SETUP time; SCHOOL schedules
- Publication
Annals of Operations Research, 2024, Vol 332, Issue 1-3, p1311
- ISSN
0254-5330
- Publication type
Correction Notice
- DOI
10.1007/s10479-023-05516-x