We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
Scheduling Model for Rehabilitation of Distribution Networks Using MINLP.
- Authors
Salman, Alaa; Moselhi, Osama; Zayed, Tarek
- Abstract
Scheduling of the rehabilitation activities of water main networks depends mainly on available budget and planning time. Other factors such as network reliability, criticality, location, contract size, and rehabilitation method(s) affect the optimization of the scheduling process. This paper presents a method for optimized scheduling of rehabilitation work for water distribution networks. The method utilizes unsupervised neural networks (UNNs) and mixed-integer nonlinear programming (MINLP) and performs the scheduling in two stages. In the first stage, UNNs are used to cluster water mains into groups according to locations and rehabilitation methods of water mains. In the second stage, MINLP is used to determine the number of rehabilitation contract packages and the generation of optimized scheduling of these packages considering network reliability, criticality, contract size, and planning time. In order to demonstrate the essential features of the developed method, a case study was analyzed and the results obtained are discussed; highlighting their utilization in practice.
- Subjects
MIXED integer linear programming; WATER distribution; ARTIFICIAL neural networks; COMPUTER programming; SCHEDULING
- Publication
Journal of Construction Engineering & Management, 2013, Vol 139, Issue 5, p498
- ISSN
0733-9364
- Publication type
Article
- DOI
10.1061/(ASCE)CO.1943-7862.0000578