- Title
面向防洪排涝的闸站施工质量 和进度保障措施研究.
- Authors
秦兴锋; 周 易
- Abstract
The construction of flood control and drainage projects is a major matter related to the safety of people's lives and property, and their quality and progress must meet the standards. When studying the flood control and drainage gate station project, some quality and progress guarantee measures have been proposed for some projects. The measures proposed in the study will increase the bearing capacity of the foundation piles of the project from 250kN to around 300kN, and the bearing capacity of the foundation piles will be increased by approximately 21. 1%. The overall structural strength of the diaphragm wall has been improved, and at the same height and width, the settlement of the diaphragm wall has increased by 0. 61mm. The project duration has been shortened from 238 days to 185 days, and the overall efficiency of the project has been improved by about 22%. The quality and schedule assurance plan proposed in the study has shown significant effectiveness.
- Publication
Water Conservancy Science & Techonlogy & Economy, 2024, Vol 30, Issue 4, p146
- ISSN
1006-7175
- Publication type
Article
- DOI
10.3969/j.issn.1006-7175.2024.04.030