Minimize the load reduction considering the activities control of the generators and phase distance.
- Authors
Trong Nghia, Le; Huy Anh, Quyen; Thanh Binh, Phan Thi; Trieu Tan, Phung
- Abstract
This study shows how to calculate the mm1mum load that needs to be reduced to resto1·e the frequency to the specified threshold. To implement this problem, the actual operation of the electricity system in the event of a generator outage is considered. The main idea of this method is to use the power balance equation between the generation and the load with different frequency levels. In all cases of operating the electrical system before and after the generator outage, the reserve capacity of other generators is considered in each generator outage situation. The reduced load capacity is calculated based on the reciprocal phase angle sensitivity or phase distance. This makes the voltage phase angle and voltage value quality of recovery nodes better. The standard IEEE 9-generator 37-bus test scheme was simulated to show the result of the proposed teclmique.
- Subjects
DISTANCES; ECCENTRIC loads
- Publication
International Journal of Electrical & Computer Engineering (2088-8708), 2021, Vol 11, Issue 2, p993
- ISSN
2088-8708
- Publication type
Article
- DOI
10.11591/ijece.v11i2.pp993-1001