Back to matchesWe found a matchYour institution may have access to this item. Find your institution then sign in to continue.TitleErratum to: Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching.AuthorsClark, Alistair; Morabito, Reinaldo; Toso, EliAbstractA correction to the article "Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching," published in the April 2010 issue is presented.SubjectsPRODUCTION schedulingPublicationJournal of Scheduling, 2011, Vol 14, Issue 1, p119ISSN1094-6136Publication typeCorrection noticeDOI10.1007/s10951-010-0175-z