We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
特长公路隧道场地地震危险性分析.
- Authors
王增运; 张建; 李涛
- Abstract
Seismic risk analysis is the key to seismic protection of engineering constructions. Based on the site of Aerjin mountain tunnel project, probabilistic seismic risk analysis method was used to divided the hierarchical space of potential source area model in this area, and was determined the seismicity parameters and corresponding attenuation relationship of source model by referred to other seismic activities. The 50 years exceeding probability of seismic risk was calculated at the level of 63%, 10% and 5% in this area. The research results can be used as a reference material for the Aerjin tunnel project site with respect to the seismic risk and risk assessment, and can be provided reference value for the seismic risk analysis of similar projects,too.
- Publication
Science Technology & Engineering, 2022, Vol 22, Issue 10, p4152
- ISSN
1671-1815
- Publication type
Article