This paper introduces the test making load rejection into plant power under 50% FP and 100% FP, analyzes the problems occurring in the test, and proposes relevant countermeasures. Meantime, the paper analyzes the response of the main parameters during load rejection test, which provides reference for the control of nuclear power units of the same type.