We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
News: Geomechanics an Tunnelling 4/2011.
- Abstract
Ground breaking at the Rennberg and Fleckberg Tunnels / Anschlag für die Tunnel Rennberg und Fleckberg Breakthrough in the Bleßberg Tunnel / Durchschlag im Tunnel Bleßberg Double breakthrough in the Airport Link East-West Tunnel / Doppelter Durchschlag im Airport Link East-West Tunnel Breakthrough at Niagara Tunnel / Durchschlag im Niagara Tunnel Opening of the Tauern Tunnel / Inbetriebnahme Tauerntunnel Züblin wins a further infrastructure contract in Denmark / Züblin gewinnt weiteren Infrastruktur-Auftrag in Dänemark IUT '11 for the sixth time in Sargans / IUT '11 zum 6. Mal in Sargans NATM - The Austrian Practice of Conventional Tunnelling
- Subjects
BRISBANE (Qld.); GERMANY; CANADA; AUSTRIA; RAILROAD tunnels; TUNNEL design &; construction; ZUBLIN AG; STRABAG AG; RAILROAD design &; construction
- Publication
Geomechanik und Tunnelbau, 2011, Vol 4, Issue 4, p279
- ISSN
1865-7362
- Publication type
Article
- DOI
10.1002/geot.201190033