We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
Optimization of production system of shale oil development in Ordos basin, China.
- Authors
Wan, Xiaolong; Ma, Shuwei; Fan, Jianming; Zhang, Yuanli; Zhang, Chao
- Abstract
In this paper, production system (PS) of shale oil is optimized according to production data and indoor experiments, including core and fluid tests. Results showed that: ① Pressure drop rate at wellhead is a reasonable reference for the determination of post-fracture shut-in duration (PFSID). When pressure at a wellhead of horizontal well is relatively stable and the pressure drop less than 0.1 MPa per day for three consecutive days, PFSID ends; ② Flowback intensity of fracturing fluid affects the effectiveness of proppant underground, thus flowback intensity can be determined by the critical flow rate and safety factor of each proppant; ③ Flowback intensity should be varied during different development stages, which could be divided into four according to production gas and oil ratio(GOR) of a shale oil horizontal well: low, medium–high, high and high-low production GOR. During the stage of low production GOR, ratio of flow pressure and saturation pressure should be maintained greater than 1.0, and the initial daily liquid productivity for a hundred-meter oil-bearing lateral length in a horizontal well is 2.4 ~ 2.9 m3/d; and during the medium–high production GOR, high production GOR and high-low production GOR stages, the responding initial daily liquid productivity should be maintained between 0.8 ~ 1.0 or less than 0.8 respectively.
- Subjects
ORDOS Desert (China); CHINA; SHALE oils; FRACTURING fluids; SAFETY factor in engineering; MATHEMATICAL optimization; OIL wells; PRESSURE drop (Fluid dynamics)
- Publication
Scientific Reports, 2023, Vol 13, Issue 1, p1
- ISSN
2045-2322
- Publication type
Article
- DOI
10.1038/s41598-023-33080-8