We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
软土地区浅埋大直径盾构隧道管片上浮规律及 预测:以上海机场联络线工程为例.
- Authors
高俊华; 杨光; 赵森森; 黄忠凯; 张吾渝; 张冬梅
- Abstract
In order to explore segment uplifting pattern and influencing factors of large-diameter shield tunnel in soft soil area, based on the measured data of project of shallow buried large-diameter tunnel of Shanghai airport contact line, the influence of shield attitude change on segment uplifting was analyzed. The correlation between segment uplifting and tunnelling status was revealed. And a nonlinear prediction method for segment uplifting considering multiple factors was proposed. The process of segment uplifting can be divided into four stages: initial deviation and deformation before exiting the shield tail, rapid uplifting (5 rings from the shield tail), slow uplifting (5 ~ 15 rings from the shield tail) and settlement. Segment uplifting is greatly affected by shield attitude, segment attitude and overcutting. The uplifting of the segment is positively correlated with the average thrust, shield elevation and average propulsion speed, while negatively correlated with the gap difference between lower and upper shield tails. The nonlinear fitting method can predict tunnel uplifting well taking multiple factors into consideration. The research can provide reference for prediction and control of uplifting of shallow large-diameter shield tunnel.
- Publication
Science Technology & Engineering, 2024, Vol 24, Issue 11, p4759
- ISSN
1671-1815
- Publication type
Article
- DOI
10.12404/j.issn.1671-1815.2304192