- Title
A study on the risk management of the CASA-1000 project.
- Authors
Daisuke Sasaki; Mikiyasu Nakayama
- Abstract
This study aimed at conducting both qualitative and quantitative analyses of the Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000) to obtain risk management information. Consequently, real options were introduced in the form of risk hedges, and we attempted to estimate the hedge cost. Through qualitative analysis we identified the geopolitical risks. We also see that a certain degree of demand risk exists. Therefore, when evaluating project feasibility, it would be better to consider the hedge cost of these risks. Through quantitative analysis, when weighted average cost of capital is ≤10.0% and volatility is below a certain value, a hedge risk based on real options and the introduction of private funds may be possible. Thus, from a risk management viewpoint, it could be suggested that introducing private funds is possible in certain situations.
- Subjects
ELECTRIC power production; RISK management in energy industries; ELECTRIC power transmission; REAL options (Finance); DISCOUNTED cash flow; CAPITAL costs
- Publication
Hydrological Research Letters, 2015, Vol 9, Issue 4, p90
- ISSN
1882-3416
- Publication type
Article
- DOI
10.3178/hrl.9.90